Comprehensive Overview of VA-OIG MIS Solution and Management Information System

Slide Note
Embed
Share

Delve into the world of VA-OIG MIS Solution and Management Information System through a series of informative images and descriptions. Explore topics ranging from team structures to completed project reports, showcasing the utilization of EWP data and the central team's projects. Gain insights into our main MIS reports, custom fields in EWP, and the dynamics of division Gantt charts, providing a detailed look at the intricacies of our environment and information systems.


Uploaded on Aug 31, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. VA-OIG MIS SOLUTION M Management I Information S System 1

  2. AGENDA Suite Introduction Our Environment Utilization of EWP data Team Central vs. Our Solution Examples of Our Reports 2

  3. SUITE INTRODUCTION 3

  4. OUR ENVIRONMENT 217 TeamMate users 17 Divisions Quality Assurance Four person team 4

  5. PROFILE IN EWP 5

  6. MILESTONES IN EWP 6

  7. CUSTOM FIELDS IN EWP 7

  8. MANAGEMENT INFORMATION SYSTEM People Automation Hardware MIS Reporting Software Data 8

  9. TEAM CENTRAL COMPLETED PROJECTS REPORT Can t change width of column Can t add or remove columns that the management wants to see 9

  10. OUR COMPLETED PROJECTS REPORT Everything you see here can be formatted the way you want it Grouped by Division, then each manager under that division We are showing the Start, Draft and Report Signed milestones. You could choose more or less to be displayed We are displaying the Title, Report number and Project number. 10

  11. Before we look at specific reports ANY QUESTIONS 11

  12. ABOUT THE REPORTS 100% of form TeamMate Real time Parameters/Filters 12

  13. OUR MAIN MIS REPORTS 13

  14. DIVISION GANTT CHART Parameters Division Select a single division Status Defaults to show all planning, in-progress and completed projects Fiscal Year Defaults to show the prior, current, and next fiscal years This report is designed to give you a visual representation of all the projects for a division. It is not designed to show every milestone date. If you would like to see more information about a project you can click on the Gantt chart bar for that project. This will show you every milestone (estimated and actual) along with other information such as time charged to the various phases. 14

  15. 15

  16. IN PROGRESS MILESTONE TRACKING Parameters DAIGAE and/or AIGAE Defaults to show all projects for 52, 52A and 52B Show Only Inspections This is a yes/no parameter and allows you to view only Inspections This report is designed to show all the milestones for a project. For each milestone the report looks for the actual milestone, then the revised, then estimated. This way the report is showing the current date for that milestone. Inspections will ALWAYS be on the last page because they have a different order of milestones than all other projects. 16

  17. 17

  18. PROGRESS REPORT Parameters DAIAGE or AIGAE Defaults to show all projects for 52, 52A and 52B Group Report by Allows you to group the report by Scope or Division Show Next Fiscal Year Defaults to show the current and next fiscal year. This parameter will allow you to show/not show the next fiscal year. This report is designed to show all the information about projects in the current and next fiscal year. This report also combines several different reports into one. 18

  19. 19

  20. 20

  21. OTHER REPORTS 21

  22. ALL PROJECTS BY DIVISION Parameter Division Select a single division This report is designed to compare estimated versus actual length and milestones for all projects in a division. Page 2 is a vertical bar graph that compares the average estimated and actual lengths of each type of project for each fiscal year. Page 3 is a vertical bar graph that shows the average days over/under for each milestone. Starting on page four is a list of all projects by fiscal year followed by a detailed list of every project with all the estimated and actual milestones. 22

  23. 23

  24. OTHER EXAMPLES Summary of Coaching Notes Project assignments Organization chart Edit history 24

  25. BENEFITS OF THIS SOLUTION All data is coming out of TeamMate Formatting Meaningful, Organized and Consistent Monitor Performance Ease of Access 25

  26. QUESTIONS 26

  27. APPENDIX A Audit plan Fiscal year the project was created Entities Area(s) the audit covers Unit Currently not used Group VA Office being audited Type VA business line Location Field office responsible Scope Type of deliverable Origin Where the project came from Staff Type DAIGAE or AIGAE responsible 27

  28. APPENDIX B CATEGORIES OPTIONS 28