Comprehensive Overview of FDOT Project Procurement Process

Slide Note
Embed
Share

This content provides details on the FDOT project procurement process led by Project Manager Ryan Weeks. It includes information on shortlisting firms based on letters of interest, selection criteria, required design elements for truck parking facilities, budget considerations, schedule requirements, and the Technical Review Committee involved. Additionally, it highlights the importance of safety and preparation for marketing meetings. The Safety Message emphasizes a focus on safe driving practices.


Uploaded on Sep 26, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. FDOT Project Manager: Ryan Weeks

  2. Procurement Information: The shortlisting of firms will be based upon the submitted letters of interest. Three firms will be shortlisted. The final selection will be based upon the Presentation procurement method.

  3. Procurement Information: Please ensure that you fully address: Please illustrate your approach to maximize the truck parking facility. How many additional truck parking spaces can be added? Describe the proposed lighting design. All parking spaces need to be connected to the FDOT TPAS system. What drainage improvements will be required? What variations or exceptions will be required? Describe the proposed pavement design. Describe the proposed pavement marking layout. How will your design accommodate ADA users. Please illustrate how your proposed design will accommodate the given budget. $714,720 Phase 32 (Survey and Design Services) $5,192,393 Phase 52 (Construction Services) Please illustrate your proposed schedule to meet a November 2026 Production date. Can you meet an earlier Production date?

  4. Technical Review Committee: Ryan Weeks FDOT Design Project Manager Amanda Tyner FDOT Freight Coordinator Sherry Mitchem FDOT Traffic Designer IV

  5. Marketing Meetings: Please ensure you watch the safety message included with this presentation. Please come to the Marketing Meeting ready to discuss any questions that you may have.

  6. Safety Message CVSA Operation Safe Driver Promotional Video