Cold Boxes and Bridge Width - Operational Overview

Slide Note
Embed
Share

The current status and future positioning of cold boxes in the cleanroom for Detector #1, along with considerations for bridge width adjustments and the functionality of the cold boxes. Features include the need for three boxes, cable management, cryogenic systems, and potential repositioning strategies for Detector #3. The optimization of bridge width and stairs for effective cleanroom operations is also discussed.


Uploaded on Sep 24, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Cold Boxes Underground and Width of Bridge Diamanto Smargianaki William Miller October 30th, 2018v3 Position of Cold Boxes in cleanroom for Detector #1 October 30, 2018 1 Cold boxes and Bridge Width

  2. Status of Cold Boxes The current design of in all of Diamanto s snap shots show two ProtoDUNE cold boxes stacked on top of each other. No structural work has been done on this yet. We have an interference with the current concept of the stairs which could be corrected by narrowing the bridge by ~50cm. This also helps with the depth of the cold box which we believe does not give us enough room for temperature sensors and some sort of cable harness Using the current size with a 50cm gap between each box they do fit in the area between the pumps for construction of Detector # 3-See Separate Talk October 30, 2018 Cold boxes and Bridge Width 2

  3. Features of Cold Boxes Draft document of Cold Box functionality is posted with this talk Key features: Three boxes are needed for current installation schedule A completed APA pair with final cables and cable trays fit in the box, along with all needed sensors and cryogenic plumbing To eliminate opening the roof and using the cavern overhead crane like in ProtoDUNE the doors are on a hinge Cable, cooldown, test, warm up and un-cable is done over a 4 day period Cryogenic system is designed so that work does not have to stop in cleanroom during cool down (as in ProtoDUNE) The boxes can be moved from the current location to in front of the TCO for Detector #3 Layout of cleanroom cold boxes, cryo pumps for Detector #3 October 30, 2018 Cold boxes and Bridge Width 3

  4. Future position of Cold Boxes When the first SP detector is completed we could move the cold boxes in front of the TCO of the completed detector between the pumps This gives us enough space to assembly Detector #3 assuming it is Single Phase This has not been optimized yet but it looks like it fits. See talk on Detector #3 Installation October 30, 2018 Cold boxes and Bridge Width 4

  5. Bridge Width and Stairs

  6. Bridge Beam Width We were asked if it was possible to reduce the bridge width by ~50cm on the side of the bridge were the permanent stairs are located. 4.5m This actually helps the new proposed layout of the cleanroom as we had several interferences: The top section of stairs would force us to move the cold boxes to the North With the depth of the cold boxes increasing it would be difficult to build or move them with the cavern overhead crane without additional space Allows is to move cold boxes once the detector is completed October 30, 2018 Cold boxes and Bridge Width 6

  7. Current Stair location The top flight of stairs interferes with the southern most cold box. October 30, 2018 Cold boxes and Bridge Width 7

  8. Depth of cold boxes not defined There is only a conceptual design of the cold box but it appears it is extremely tight with only 3.5m space between the warm structure and the bridge beam Allows use of crane to build cold box New Bridge Width October 30, 2018 Cold boxes and Bridge Width 8

  9. October 30, 2018 Cold boxes and Bridge Width 9

  10. October 30, 2018 Cold boxes and Bridge Width 10

Related


More Related Content