The China SWIM program, initiated in 2011, is a sub-program under the China Civil Aviation Collaborative ATM Technology Program. Funded by the Ministry of Science and Technology (MOST) and the Civil Aviation Administration of China (CAAC), the project aims to study and evaluate SWIM concepts and key technologies to propose an Information Management Infrastructure for the next generation ATM system in China. The project also involves prototyping and demonstrating initial SWIM capabilities through various tasks in its initial phase. Collaborating entities include the Technical Center of ATMB, North China ATMB, Aero-Info Technologies, Travelsky, and Beihang University.


Uploaded on Nov 21, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. SP/12 China Initial SWIM Program Overview Air Traffic Management Bureau, CAAC Aero-Info Technologies Chiang Mai, March 2012

  2. Background China Initial SWIM Project launched in 2011 A sub-program of China Civil Aviation Collaborative ATM Technology Program, Funding by Ministry of Science and Technology (MOST) and Civil Aviation Administration of China(CAAC) 2

  3. Background The project aims to Study and evaluate SWIM concept and key technologies Propose Information Management Infrastructure for next generation ATM system in China Prototype and demonstrate initial SWIM capabilities 3

  4. Schedule TASK 1 SWIM Requirements Analysis Task 1(Phase I) Milestone Task 1(Phase II) Milestone TASK 2 SWIMKey technologies study Task 2(Phase I) Milestone Task 2(Phase II) Milestone TASK 3 SWIMprototype development Task 3(Phase I) Milestone Task 3(Phase II) Milestone TASK4 SWIMdemo system deployment and evaluation Task 4 Milestone 2013.6 2014.1 2014.6 2011 2012.6 2013.1 2014.12 4

  5. Tasks of initial phase (1) Prototype platform requirement analysis Bottom Up What current ATM applications are involved in SWIM? What types of information are shared through SWIM? Top Down New ATM operation concepts and procedures 5

  6. Tasks of initial phase (2) Technology study Investigate current ATM system characteristics e.g. ATC, AIS, MET Technology pre-screening based on defined selection principle and criteria High level system architecture candidates e.g. SOA, EAI Integration technology candidates e.g. Web Service, REST, MOM, JMS, CORBA . Should pay more attentions to particular driving force of architecture design, i.e. security, performance, governance etc. 6

  7. Tasks of initial phase (3) Establish SWIM laboratory Technology assessment Prototype development Test bed 7

  8. Participants TECHNICAL CENTER OF ATMB NORTH CHINA ATMB AERO-INFO TECHNOLOGIES China Travelsky BEIHANG UNIVERSITY 8

  9. Plan of 2012 Annual target Launch platform requirement analysis Start examining varies candidate technologies Expected deliverables Defined project management principle Identify Platform requirement Key technology assessment report 9