Campus Renovation and Construction Projects Overview

undefined
 
Environmental Health & Safety, Maintenance and Operations; Major Projects; Sustainability
Construction:
Wilber Hall for Education Phase 2.1 (Aug.16)
Tyler Hall for Communication, Media & Arts
Culkin Data Center
Rich Hall for Business & OCBR
Hewitt Union (Hall) for Communications & Cont. Ed/Ext. Learning
Marano Campus Center for Cont. Ed/Ext. Learning
ADA Signage/ Exterior Wayfinding Signage
Upgrades to Vehicular & Pedestrian Surfaces II, Ph. V
Construction:
Wilber Hall for Education
Tyler Hall for Communication, Media & Arts  (Jul. 16)
Phase I: Waterman Theater; Art Gallery; Recital Hall; & Offices
Phase I.I:  Choral Room; Theater Rigging
Phase 2.0:  2
nd
 Floor Art, Printmaking; Photography, & Offices 
Culkin Data Center
Rich Hall for Business & OCBR
Hewitt Union (Hall) for Communications & Cont. Ed/Ext. Learning
Marano Campus Center for Cont. Ed/Ext. Learning
ADA Signage/ Exterior Wayfinding Signage
Upgrades to Vehicular & Pedestrian Surfaces II, Ph. V
Construction:
Wilber Hall for Education
Tyler Hall for Communication, Media & Arts
Culkin Data Center (Aug. 16)
Ground Floor behind CTS Office.
Reduce Floor Space and energy
Rich Hall for Business & OCBR
Hewitt Union (Hall) for Communications & Cont. Ed/Ext. Learning
Marano Campus Center for CE-EL, Athletics, & SUMS
ADA Signage/ Exterior Wayfinding Signage
Upgrades to Vehicular & Pedestrian Surfaces II, Ph. V
Construction:
Wilber Hall for Education
Tyler Hall for Communication, Media & Arts
Culkin Data Center
Rich Hall for  School of Business & OBCR
OBCR to Relocate to Downtown Location (7/16)
Business to Repurpose and Occupy Vacated Space (8/16)
Hewitt Union (Hall) for Communications & Cont. Ed/Ext. Learning
Marano Campus Center for Cont. Ed/Ext. Learning
ADA Signage/ Exterior Wayfinding Signage
Upgrades to Vehicular & Pedestrian Surfaces II, Ph. V
Construction:
Wilber Hall for Education
Tyler Hall for Communication, Media & Arts
Culkin Data Center
Rich Hall for Business & OCBR
Hewitt Union for SCMA Surge (Aug 16)
Selected Art and Theater Programs & Faculty to Vacate to Tyler
Selected Communication Faculty to Relocate from Lanigan
Selected Phoenix Center Programs to be Relocated to Main Campus
 
Marano Campus Center for Cont. Ed/Ext. Learning, Athletics
ADA Signage/ Exterior Wayfinding Signage
Upgrades to Vehicular & Pedestrian Surfaces II, Ph. V
Lakeside Streamline Replacement – East Section
Construction:
Wilber Hall for Education
Tyler Hall for Communication, Media & Arts
Culkin Data Center
Rich Hall for Business & OCBR
Hewitt Union for Communication & Cont. Ed/Ext. Learning
 
Marano Campus Center for Extended Learning, SUMS
 
 and Athletics (Aug 16)
Repurpose Copy Center for Continuing Ed./Extended Learning
SUNY Undergraduate Mathematics Success (SUMS) in Poucher Hall
History of Oswego Hockey Exhibit
ADA Signage/ Exterior Wayfinding Signage
Upgrades to Vehicular & Pedestrian Surfaces II, Ph. V
Lakeside Streamline Replacement – East Section
Construction:
Wilber Hall for Education
Tyler Hall for Communication, Media & Arts
Culkin Data Center
Rich Hall for Business & OCBR
Hewitt Union for Communication & Cont. Ed/Ext. Learning
Marano Campus Center for Cont. Ed/Ext. Learning, Athletics, SUMS
ADA Signage/ Exterior Wayfinding Signage (Aug. 16)
Interior Phase IV – Service Building, Commissary, Bldg. 20, Marano Campus Ctr.
Exterior   - Parking Lot , Tobacco Free Signs
Upgrades to Vehicular & Pedestrian Surfaces II, Ph. V
Lakeside Streamline Replacement – East Section
Exterior Wayfinding
Construction:
Wilber Hall for Education
Tyler Hall for Communication, Media & Arts
Culkin Data Center
Rich Hall for Business & OCBR
Hewitt Union for Communication & Cont. Ed/Ext. Learning
Marano Campus Center for Cont. Ed/Ext. Learning, Athletics, SUMS
ADA Signage/ Exterior Wayfinding Signage
Upgrades to Vehicular & Pedestrian Surfaces II, Ph. V
Molison Road, Barns Road, & Commuter Parking Lot. 
7  (Aug. 16)
Lakeside Streamline Replacement – East Section
 
Wilber Hall for Education
Tyler Hall for Communication, Media & Arts
Culkin Data Center
Rich Hall for Business & OCBR
Hewitt Union for Communication & Extended Learning
Marano Campus Center for Extended Learning, Athletics, SUMS
ADA Signage/ Exterior Wayfinding Signage
Upgrades to Vehicular & Pedestrian Surfaces II, Ph. V
Lakeside Streamline Replacement – East Section (Aug. 16)
  
Rudolph Road from Centennial Drive to Johnson Hall Loop
 
Design:
SOE Phase III for School Education
Tyler Hall  Phases 2.1…. for Art, Theater, & Music
Marano Campus Center ( Swetman Hall)  for Campus Life 
Rehab Mary Walker Health Center
Lee Hall Window & Door Replacement
Planning:
Hewitt Union: Communication, Graphic Design, 
and
 Cinema & Screen
Studies
Lee Hall: Intramurals & Recreation
Laker Hall: Intercollegiate Athletics
Questions?
Thank You!
 
 
Slide Note
Embed
Share

In the realm of Environmental Health & Safety, Maintenance, and Operations, our university is undertaking major construction projects with a focus on sustainability and modernization. The ongoing developments include renovations and new constructions across various facilities such as Wilber Tyler Hall for Communication, Media & Arts, Culkin Data Center, Rich Hall for Business, and more. These endeavors aim to enhance our campus infrastructure and support academic excellence.

  • Campus Renovation
  • Construction Projects
  • Environmental Health
  • Sustainability
  • Maintenance

Uploaded on Sep 10, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Environmental Health & Safety, Maintenance and Operations; Major Projects; Sustainability

  2. Construction: Wilber Tyler Hall for Communication, Media & Arts Culkin Data Center Rich Hall for Business & OCBR Hewitt Union (Hall) for Communications & Cont. Ed/Ext. Learning Marano Campus Center for Cont. Ed/Ext. Learning ADA Signage/ Exterior Wayfinding Signage Upgrades to Vehicular & Pedestrian Surfaces II, Ph. V Wilber Hall Hall for Education Phase 2.1 (Aug.16) for Education Phase 2.1 (Aug.16)

  3. Construction: Wilber Hall for Education Tyler Hall for Communication, Media & Arts (Jul. 16) Tyler Hall for Communication, Media & Arts (Jul. 16) Phase I: Waterman Theater; Art Gallery; Recital Hall; & Offices Phase I.I: Choral Room; Theater Rigging Phase 2.0: 2 Phase I: Waterman Theater; Art Gallery; Recital Hall; & Offices Phase I.I: Choral Room; Theater Rigging Phase 2.0: 2nd ndFloor Art, Printmaking; Photography, & Offices Floor Art, Printmaking; Photography, & Offices Culkin Data Center Rich Hall for Business & OCBR Hewitt Union (Hall) for Communications & Cont. Ed/Ext. Learning Marano Campus Center for Cont. Ed/Ext. Learning ADA Signage/ Exterior Wayfinding Signage Upgrades to Vehicular & Pedestrian Surfaces II, Ph. V

  4. Construction: Wilber Hall for Education Tyler Hall for Communication, Media & Arts Culkin Data Center (Aug. 16) Culkin Data Center (Aug. 16) Ground Floor behind CTS Office. Reduce Floor Space and energy Ground Floor behind CTS Office. Reduce Floor Space and energy Rich Hall for Business & OCBR Hewitt Union (Hall) for Communications & Cont. Ed/Ext. Learning Marano Campus Center for CE-EL, Athletics, & SUMS ADA Signage/ Exterior Wayfinding Signage Upgrades to Vehicular & Pedestrian Surfaces II, Ph. V

  5. Construction: Wilber Hall for Education Tyler Hall for Communication, Media & Arts Culkin Data Center Rich Hall for School of Business & OBCR OBCR to Relocate to Downtown Location (7/16) Business to Repurpose and Occupy Vacated Space (8/16) Rich Hall for School of Business & OBCR OBCR to Relocate to Downtown Location (7/16) Business to Repurpose and Occupy Vacated Space (8/16) Hewitt Union (Hall) for Communications & Cont. Ed/Ext. Learning Marano Campus Center for Cont. Ed/Ext. Learning ADA Signage/ Exterior Wayfinding Signage Upgrades to Vehicular & Pedestrian Surfaces II, Ph. V

  6. Construction: Wilber Hall for Education Tyler Hall for Communication, Media & Arts Culkin Data Center Rich Hall for Business & OCBR Hewitt Union for SCMA Surge (Aug 16) Hewitt Union for SCMA Surge (Aug 16) Selected Art and Theater Programs & Faculty to Vacate to Tyler Selected Communication Faculty to Relocate from Lanigan Selected Phoenix Center Programs to be Relocated to Main Campus Marano Campus Center for Cont. Ed/Ext. Learning, Athletics ADA Signage/ Exterior Wayfinding Signage Upgrades to Vehicular & Pedestrian Surfaces II, Ph. V Lakeside Streamline Replacement East Section

  7. Construction: Wilber Hall for Education Tyler Hall for Communication, Media & Arts Culkin Data Center Rich Hall for Business & OCBR Hewitt Union for Communication & Cont. Ed/Ext. Learning Marano Campus Center for Extended Learning, and Athletics (Aug 16) Marano Campus Center for Extended Learning, SUMS and Athletics (Aug 16) SUMS Repurpose Copy Center for Continuing Ed./Extended Learning SUNY Undergraduate Mathematics Success (SUMS) in Poucher Hall History of Oswego Hockey Exhibit Repurpose Copy Center for Continuing Ed./Extended Learning SUNY Undergraduate Mathematics Success (SUMS) in Poucher Hall History of Oswego Hockey Exhibit ADA Signage/ Exterior Wayfinding Signage Upgrades to Vehicular & Pedestrian Surfaces II, Ph. V Lakeside Streamline Replacement East Section

  8. Construction: Wilber Hall for Education Tyler Hall for Communication, Media & Arts Culkin Data Center Rich Hall for Business & OCBR Hewitt Union for Communication & Cont. Ed/Ext. Learning Marano Campus Center for Cont. Ed/Ext. Learning, Athletics, SUMS ADA Signage/ Exterior Wayfinding Signage (Aug. 16) ADA Signage/ Exterior Wayfinding Signage (Aug. 16) Interior Phase IV Exterior Interior Phase IV Service Building, Commissary, Bldg. 20, Marano Campus Ctr. Exterior - - Parking Lot , Tobacco Free Signs Service Building, Commissary, Bldg. 20, Marano Campus Ctr. Parking Lot , Tobacco Free Signs Upgrades to Vehicular & Pedestrian Surfaces II, Ph. V Lakeside Streamline Replacement East Section

  9. Exterior Wayfinding

  10. Construction: Wilber Hall for Education Tyler Hall for Communication, Media & Arts Culkin Data Center Rich Hall for Business & OCBR Hewitt Union for Communication & Cont. Ed/Ext. Learning Marano Campus Center for Cont. Ed/Ext. Learning, Athletics, SUMS ADA Signage/ Exterior Wayfinding Signage Upgrades to Vehicular & Pedestrian Surfaces II, Ph. V Upgrades to Vehicular & Pedestrian Surfaces II, Ph. V Molison Road, Barns Road, & Commuter Parking Lot. Molison Road, Barns Road, & Commuter Parking Lot. 7 (Aug. 16) Lakeside Streamline Replacement East Section

  11. Wilber Hall for Education Tyler Hall for Communication, Media & Arts Culkin Data Center Rich Hall for Business & OCBR Hewitt Union for Communication & Extended Learning Marano Campus Center for Extended Learning, Athletics, SUMS ADA Signage/ Exterior Wayfinding Signage Upgrades to Vehicular & Pedestrian Surfaces II, Ph. V Lakeside Streamline Replacement Lakeside Streamline Replacement East Section (Aug. 16) East Section (Aug. 16) Rudolph Road from Centennial Drive to Johnson Hall Loop Rudolph Road from Centennial Drive to Johnson Hall Loop

  12. Design: SOE Phase III for School Education Tyler Hall Phases 2.1 . for Art, Theater, & Music Marano Campus Center ( Swetman Hall) for Campus Life Rehab Mary Walker Health Center Lee Hall Window & Door Replacement Planning: Hewitt Union: Communication, Graphic Design, and Cinema & Screen Studies Lee Hall: Intramurals & Recreation Laker Hall: Intercollegiate Athletics

  13. Questions? Thank You!