Baglung Nagar Water Supply and Sanitation Project Overview

 
Baglung Nagar Water Supply and
Sanitation Project
 
Project Appraisal
 
Group work
 
Group Members
 
1.
Kanchan Kumar Nayak
2.
Lok Bahadur Bhandari
3.
Purna Prasad Upadhyaya
4.
Ram Sogarath Sah
5.
Roshan Neupane
6.
Rupak Maharjan
 
Project Area - Introduction
 
 Name of Project: Baglung Nagar Water Supply and
Sanitation Project (WSSP)
District: Baglung
Municipality: Baglung
 Ward No.: 1,2,3
           (Baglung Bazaar Area)
 Population : 30300 (2017)
 Household:  5050 (2017)
 
Existing Features of Baglung WSP
 
Existing Water Supply Plant
 
Layout Plan of Existing WSP
 
Objective of Feasibility Study
 
 To upgrade existing water supply system of
Baglung urban area by adding new sources to
fulfill water demand and expand distribution
system to new demand areas.
 
Proposed Features
 
Demand Analysis
 
Technical Analysis
 
Available Sources:
1.
 Dundiya Khola  ( 130-150 lps, Social conflict )
2.
 Kaligandaki River ( unlimited discharge, Black water,
High investment cost, double stage lift)
3.
 Kathekhola Gaudakot ( 130- 150 lps, 250m head,
feasible source)
Design Parameter:
 Sump well at Kathekhola
 Total Head - 223m ( Single Stage pumping)
 Sump well to Treatment Plant Distance - 350m
 Pump capacity - 60 HP
Operational Time – 24 hr
Pumping Rate – 14 lps
Diesel Generator – 1 no.
Transformer 100 KVA – 1 no.
 
 
Technical Analysis
 
Operation Technology :
 Skilled Manpower
 Engineer/ Manager
   
- 1no.
 Plant Supervisor/ Mechanical Overseer
 
- 1 no.
 Pump Operator
   
- 2 no.
 Plumber 
    
- 1 no.
  Maintenance cost
 
- NRs. 6,85,415.00
 Operational cost 
 
- NRs. 75,17,260.00
 
 
 
Financial Analysis
 
Investment cost :  NRs. 9,13,88,750.00
  
- Government – NRs. 6,39,72,125.00
     
(70% of Total Cost)
  
- Users
 
      - NRs. 2,74,16,625.00
   
( Cash 10%,  kind contribution 20% of Total Cost)
 Willingness and commitment of investment from WUSC
Maintenance cost
 
- NRs. 6,85,415.00
 Operational cost 
 
- NRs. 75,17,260.00
 
 
 
Financial Analysis contd….
 
Affordability
 Income from New Connection- NRs. 21,010.00 (5000
refundable)
  Tariff per Month per HH – NRs. 218.00
  Tariff per Year – 218*12*5151= NRs. 1,34,75,016.00
Total Cash inflow: NRs. 1,34,75,016.00
Total cash outflow: NRs. 82,02,675.00
 
 
 
Environmental Aspect
 
 Population of Project Service area- 41,595 nos.
Threshold less than 10,000- 1,00,000 nos.
population as per EPA& EPR Initial Environment
Examination (IEE) is required
 
 
 
Conclusion
 
  Technically and Financially feasible
  Requirement of conducting IEE
 
 
 
 
 
Conclusion and Recommendation
 
Water tariff is high for new connection in comparison
to present HH connection
 Population analysis of base year is not realistic
 Objective is not specific on report
Remuneration is under estimate specially lower staff
Risk analysis of project is not carried ( extra pump)
Institutional linkage with user group/government
agencies
Monitoring plan of water quality testing should be
made
 
 
 
 
 
 
 
Thank You
Slide Note
Embed
Share

The Baglung Nagar Water Supply and Sanitation Project aims to upgrade the existing water supply system in Baglung urban area by adding new water sources, expanding the distribution system, and fulfilling the water demand of the growing population. With a focus on sustainability and efficiency, the project involves the construction of new structures, transmission systems, and infrastructure to ensure reliable and clean water supply to the community. The proposed features, existing plant information, project area details, and group members involved in the project are presented in the appraisal report.

  • Baglung
  • Water Supply
  • Sanitation Project
  • Infrastructure
  • Urban Development

Uploaded on Jul 29, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Baglung Nagar Water Supply and Sanitation Project Project Appraisal Group work

  2. Group Members 1. Kanchan Kumar Nayak 2. Lok Bahadur Bhandari 3. Purna Prasad Upadhyaya 4. Ram Sogarath Sah 5. Roshan Neupane 6. Rupak Maharjan

  3. Project Area - Introduction Name of Project: Baglung Nagar Water Supply and Sanitation Project (WSSP) District: Baglung Municipality: Baglung Ward No.: 1,2,3 (Baglung Bazaar Area) Population : 30300 (2017) Household: 5050 (2017)

  4. Existing Features of Baglung WSP Total Household 5050 Total Population 30300 Household Connection 3596 No. of water sources 3 nos Capacity of Sources of water 36.5 liter per second (31 lps in dry season) Capacity of Treatment Plant Capacity of RVT 60 to 65 lps 10,00,000 liter Operation and Management Baglung Nagar Water Users Committee

  5. Existing Water Supply Plant

  6. Layout Plan of Existing WSP

  7. Objective of Feasibility Study To upgrade existing water supply system of Baglung urban area by adding new sources to fulfill water demand and expand distribution system to new demand areas.

  8. Proposed Features Kathekhola- Gaudakot source Name of sources Design Discharge 28 lps by new source Design Population 41595 nos Design Period 15 year Transmission System Lift system by pumping 300m uplift head New structures Intake at source, Pumping system, office and guard building, extension of distribution system Approach road and Distance Baglung Bazaar to Gaudakot- Simle Road (300m downhill from existing water supply treatment Plant at Ratmata) Estimated Cost NRs. 9,13,88,700.00 (70%- Gov. and 30%- User) Construction materials Pipes, fittings, water pump, cement, sand, aggregate, steel reinforcement, pumping system

  9. Demand Analysis Item Population Base Year (2018) 30906 Design year (2033) 41595 Per Capita Demand 100 lpcd 100 lpcd Total Water Demand 39.35 lps 58.84lps Existing Water Supply 36.5 lps (31 lps at Dry months) Demand deficit 8.35 lps 27.84 lps

  10. Technical Analysis Available Sources: 1. 2. Dundiya Khola ( 130-150 lps, Social conflict ) Kaligandaki River ( unlimited discharge, Black water, High investment cost, double stage lift) Kathekhola Gaudakot ( 130- 150 lps, 250m head, feasible source) 3. Design Parameter: Sump well at Kathekhola Total Head - 223m ( Single Stage pumping) Sump well to Treatment Plant Distance - 350m Pump capacity - 60 HP Operational Time 24 hr Pumping Rate 14 lps Diesel Generator 1 no. Transformer 100 KVA 1 no.

  11. Technical Analysis Operation Technology : Skilled Manpower Engineer/ Manager Plant Supervisor/ Mechanical Overseer Pump Operator Plumber Maintenance cost - NRs. 6,85,415.00 Operational cost - 1no. - 1 no. - 2 no. - 1 no. - NRs. 75,17,260.00

  12. Financial Analysis Investment cost : NRs. 9,13,88,750.00 - Government NRs. 6,39,72,125.00 (70% of Total Cost) - NRs. 2,74,16,625.00 - Users ( Cash 10%, kind contribution 20% of Total Cost) Willingness and commitment of investment from WUSC Maintenance cost Operational cost - NRs. 6,85,415.00 - NRs. 75,17,260.00

  13. Financial Analysis contd. Affordability Income from New Connection- NRs. 21,010.00 (5000 refundable) Tariff per Month per HH NRs. 218.00 Tariff per Year 218*12*5151= NRs. 1,34,75,016.00 Total Cash inflow: NRs. 1,34,75,016.00 Total cash outflow: NRs. 82,02,675.00

  14. Environmental Aspect Population of Project Service area- 41,595 nos. Threshold less than 10,000- 1,00,000 nos. population as per EPA& EPR Initial Environment Examination (IEE) is required

  15. Conclusion Technically and Financially feasible Requirement of conducting IEE

  16. Conclusion and Recommendation Water tariff is high for new connection in comparison to present HH connection Population analysis of base year is not realistic Objective is not specific on report Remuneration is under estimate specially lower staff Risk analysis of project is not carried ( extra pump) Institutional linkage with user group/government agencies Monitoring plan of water quality testing should be made