Ashumet Park Common Land Project Overview

ASHUMET PARK
Common Land Project
Common Land
Project Overview
1.2 ACRES
3 PHASE PROJECT (w/
potential for future
improvements)
INTENT: To make
improvements to Lot 8
which sits at the southeast
corner of Ashumet Valley
and revitalize what was a
long-standing playground
to a multi-use community
area ideal for Annual
Meetings
Common Land
Project Overview
Phase 1: Survey
Phase 2: Land
Clearing
Phase 3: Grass
Installation
PHASE 1- Land
Survey
Land Survey was
conducted in Nov 2018
Stake/markers laid to
delineate the property line
Several encroachments
that have since been
resolved
PHASE 2- Land
Clearing
Peter J Govoni Landservices
Cut and chip all trees as
discussed
Remove all woodchips
and logs from site
Excavate stumps and
dispose of stumps off-site
Haul back 100 yards of
wood chips and dump
on-site at no charge
Total: $9,250
Deposit of $4,625
PHASE 3- Grass/Hydroseed Installment
Grass Seed
 
Avg $900 per acre for seed
Avg $180 Starter Fertilizer
Hydroseed
Hydroseeding
averages 
$2,000 
per acre
OVERALL ANTICIPATED COST
Phase 1-    $
2,500.00
     (already invested)
Phase 2-    
$9,250.00
     (already invested)
Phase 3-    $2,000.00 est
Total:        $13,750.00 est
Slide Note
Embed
Share

The Ashumet Park Common Land Project aims to transform Lot 8 into a multi-use community area in Ashumet Valley. The project includes three phases: Land Survey, Land Clearing, and Grass Installation. Phase 1 involved conducting a land survey, while Phase 2 focused on land clearing by removing trees and stumps. The final phase includes hydroseeding and grass installation. The anticipated total cost for the project is $13,750.

  • Ashumet Park
  • Land Project
  • Community Area
  • Multi-Use
  • Renovation

Uploaded on Oct 05, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. ASHUMET PARK Common Land Project

  2. Common Land Project Overview 1.2 ACRES 3 PHASE PROJECT (w/ potential for future improvements) INTENT: To make improvements to Lot 8 which sits at the southeast corner of Ashumet Valley and revitalize what was a long-standing playground to a multi-use community area ideal for Annual Meetings

  3. Common Land Project Overview Phase 1: Survey Phase 2: Land Clearing Phase 3: Grass Installation

  4. PHASE 1- Land Survey Land Survey was conducted in Nov 2018 Stake/markers laid to delineate the property line Several encroachments that have since been resolved

  5. PHASE 2- Land Clearing Peter J Govoni Landservices Cut and chip all trees as discussed Remove all woodchips and logs from site Excavate stumps and dispose of stumps off-site Haul back 100 yards of wood chips and dump on-site at no charge Total: $9,250 Deposit of $4,625

  6. PHASE 3- Grass/Hydroseed Installment Hydroseed Hydroseeding averages $2,000 per acre Grass Seed Avg $900 per acre for seed Avg $180 Starter Fertilizer

  7. OVERALL ANTICIPATED COST Phase 1- Phase 2- Phase 3- Total: $13,750.00 est $2,500.00 $9,250.00 $2,000.00 est (already invested) (already invested)

Related