1. Long term auction platform

1. Long term auction platform
Slide Note
Embed
Share

This progress report outlines the preparation for transferring long-term auctions, planning for launching coordinated products, and upcoming meetings in the energy sector. It includes details on signatures, drafting auction rules, IT system testing, and more.

  • Auctions
  • Progress
  • Energy Sector
  • Meetings
  • Coordination

Uploaded on Feb 23, 2025 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. 1. Long term auction platform IFE: Progress report. Signature of the MoU and preparation of transfer of long term auctions to CASC.EU IPE: Planning for launching a long term coordinated product 11th Implementation Group Meeting 1st March 2013

  2. IFE: Preparation of transfer of long term auctions to CASC.EU Background of the project Jun-12: Request for comfort to CRE, CNE and Spanish Ministry Oct-12: CRE and CNE sent the letter of comfort to TSOs Mid-november: Spanish Ministry issued the letter of comfort Since then NRAs have not received further information Next steps for IFE? Signature of the MoU? Draft auction rules? Public consultation on Auctions Rules NRAs approval IT system tests? (to be conducted by TSOs & CASC) Go-live for the project? 11th IG Meeting 1st March 2013

  3. IPE: Planning for launching a long term coordinated product Last meeting of the Technical committee of the MIBEL Regulators Council was held on February 5th,2013 Iberian TSOs: Reported that CASC.EU provided Iberian TSOs with the information regarding the expected costs of a extension of the mechanism to IPE It was also reported that CASC.EU is not yet entitle to give an estimation of cost for the possible implementation of FTR on the IPE (MIFID 2) Compromised to send a request for a comfort letter to CNE and ERSE at the end of February. Next steps for IPE NRAs: Evaluation of information provided by Iberian TSOs and issuance of the corresponding letter of comfort to the project. Meanwhile, knowing that CASC.EU stated not be able to provide a solution for IPE covering all the second half 2013, the MIBEL Regulatory Council is working in a solution for overpassing this difficulty 11th IG Meeting 1st March 2013

  4. Thank you for your attention Thank you for your attention!

More Related Content