Tsos - PowerPoint PPT Presentation


Revaluation of TSO Role in TE Safety Meeting 2023

The WG Revaluation of TSO Role report presented by Gunnar Lindell discusses the growing role of safety officers and the need for reevaluation. The report outlines six work packages related to safety, stakeholder cartography, and emergency response. It emphasizes the importance of safety inspections,

0 views • 26 slides


Understanding Transmission Operator Obligations in Under-Frequency Load Shedding

ERCOT Compliance ensures that Transmission System Operators (TSOs) and Distribution System Operators (DSOs) have automatic under-frequency load shedding circuits in place to provide load relief during under-frequency events. The TSOs are required to shed a specific percentage of their connected load

0 views • 6 slides



TERRE Project Stakeholder Workshop Highlights and Future Directions

Delve into the recent TERRE Stakeholder Workshop, exploring topics such as project introduction, participating TSOs, accession timelines, project structure, and future projections. Get insights on the future of the TERRE project with legal context changes and clearings implementation details discuss

0 views • 16 slides


Common Cross-Border Intraday Solution in NWE Area Roadmap

Conceptual representation of technical solutions, technical gap analysis with preliminary outcomes, phased implementation approach, and conclusions for the Common Cross-Border Intraday Solution in the NWE area are discussed. The presentation covers the Elbas structure, TSOs regions, PX interfaces, A

0 views • 25 slides


FCR Dimensioning Rules Proposal for Synchronous Area Operational Agreements

Article 118 of the Synchronous Operational Agreements introduces rules for the dimensioning of Frequency Containment Reserve (FCR). The proposal requires TSOs to jointly develop guidelines for FCR dimensioning, including annual reserve capacity determination and initial obligations. Specific criteri

0 views • 16 slides