Tsos - PowerPoint PPT Presentation


Revaluation of TSO Role in TE Safety Meeting 2023

The WG Revaluation of TSO Role report presented by Gunnar Lindell discusses the growing role of safety officers and the need for reevaluation. The report outlines six work packages related to safety, stakeholder cartography, and emergency response. It emphasizes the importance of safety inspections,

0 views • 26 slides


Understanding Transmission Operator Obligations in Under-Frequency Load Shedding

ERCOT Compliance ensures that Transmission System Operators (TSOs) and Distribution System Operators (DSOs) have automatic under-frequency load shedding circuits in place to provide load relief during under-frequency events. The TSOs are required to shed a specific percentage of their connected load

0 views • 6 slides



TERRE Project Stakeholder Workshop Highlights and Future Directions

Delve into the recent TERRE Stakeholder Workshop, exploring topics such as project introduction, participating TSOs, accession timelines, project structure, and future projections. Get insights on the future of the TERRE project with legal context changes and clearings implementation details discuss

0 views • 16 slides


Common Cross-Border Intraday Solution in NWE Area Roadmap

Conceptual representation of technical solutions, technical gap analysis with preliminary outcomes, phased implementation approach, and conclusions for the Common Cross-Border Intraday Solution in the NWE area are discussed. The presentation covers the Elbas structure, TSOs regions, PX interfaces, A

0 views • 25 slides


FCR Dimensioning Rules Proposal for Synchronous Area Operational Agreements

Article 118 of the Synchronous Operational Agreements introduces rules for the dimensioning of Frequency Containment Reserve (FCR). The proposal requires TSOs to jointly develop guidelines for FCR dimensioning, including annual reserve capacity determination and initial obligations. Specific criteri

0 views • 16 slides


Joint Project Organization in NWE Region - Presentation Highlights

The joint presentation from Transmission System Operators (TSOs) and Power Exchanges (PXs) in the NWE region discusses key aspects like the All Party Cooperation Agreement, Comfort Letter, and Project Organization. The importance of agreements, principles, and collaboration for efficient market coup

0 views • 12 slides


Energy Sector High-Level Planning Overview

Detailed high-level planning activities for the energy sector including consultation, workshops, proposal drafting, and implementation frameworks for European platforms. It also includes aspects like transparency regulation, balancing capacity products, and network coordination. The planning involve

0 views • 8 slides


MARI Initiative Updates and Stakeholder Statistics Presented in BSG Meeting

In the BSG Meeting held in Brussels, Belgium on March 5, 2018, updates on the Manually Activated Reserves Initiative (MARI) were discussed. The meeting covered membership updates, involvement of Transmission System Operators (TSOs), submission timelines for mFRR and aFRR platforms, and feedback from

0 views • 24 slides


EFET Considerations on XB Capacity Reservation for Balancing

EFET opposes TSOs reserving XB transmission capacity for balancing due to inefficiencies and missed opportunities in energy markets. Co-optimisation proposals face challenges in bid linking and uncertainty, impacting capacity allocation and balancing procedures. Stronger leadership from ENTSO-E is n

0 views • 4 slides


Workshop Presentation on FCA Article 30 - Energinet and Svenska kraftnät

Workshop held on September 12th, 2017, by Energinet and Svenska kraftnät focusing on the involvement of market participants, brainstorming sessions, and discussions on TSO actions following rulings. The presentation covers the purpose of the workshop, today's agenda, introduction to the subject, ru

0 views • 29 slides


Co-optimisation Process for Cross-Zonal Capacity Allocation

The meeting discussed the co-optimisation process for cross-zonal capacity allocation outlined in Article 40. It includes developing a methodology for the allocation process, feedback from public consultation, and a timeline for implementation. Stakeholders raised concerns regarding co-optimization

0 views • 10 slides


CWE Flow-Based Intraday Developments - Current Status and Future Outlook

CWE has been working on implementing Flow-Based Intraday Capacity Calculation (FB.IDCC) initiatives since 2014, focusing on improving ID ATC processes and methodologies. Despite challenges with CGMES standards implementation causing delays, CWE TSOs and NRAs have agreed to temporarily halt FB.IDCC a

0 views • 4 slides