Protodune - PowerPoint PPT Presentation


Advancements in Signal Processing for ProtoDUNE Experiment

The team, including Xin Qian, Chao Zhang, and Brett Viren from BNL, leverages past experience in MicroBooNE to outline a comprehensive work plan for signal processing in ProtoDUNE. Their focus includes managing excess noise, addressing non-functional channels, and evolving signal processing techniqu

1 views • 23 slides


Comprehensive Review of TDR Plan and Schedule for LBNC Concerns

The TDR plan and schedule, as reviewed on December 8, 2018, includes addressing key IDR issues, updating with ProtoDUNE information, and incorporating project-level details. LBNC's concerns focus on requirements, length, and structure modifications like breaking TDR and CDRs into standalone volumes

0 views • 14 slides



Development Updates for ProtoDUNE Phase II: CRP Modifications and Testing

Updates on the development of Charged Readout Plane (CRP) for ProtoDUNE Phase II driven by lessons from commissioning and operation in ProtoDUNE-DP. Major topics include modifications for CRP mechanical structure, new LEM development, cold box improvements, and testing plans. Detailed steps per syst

0 views • 7 slides


Review of Long-Baseline Neutrino Facility Cryogenics Performance and Recommendations

The review of cryogenics performance at the Long-Baseline Neutrino Facility highlighted the priority given to cryogenics testing on ProtoDUNE. The comprehensive commissioning plan includes testing of the cryostat, cryogenics, and detectors, with a focus on data collection and simulation validation.

0 views • 18 slides


Organizing DAQ and Operational Spaces for ProtoDUNE Project

In the context of the ProtoDUNE project, the organization of DAQ and operational spaces is crucial for efficient functioning. The initial installation at CERN faced challenges, prompting the need for remote control capabilities. The setup at SURF requires a thoughtful layout to accommodate key subsy

0 views • 8 slides