ESSnuSB Emmittance Accumulator Meeting Summary
Meeting held on 7/11/2018 to discuss fixing emittances for the Emmittance.ESSnuSB.Accumulator. Various specifications and requirements were considered, including beam properties, target specifications, and beam distribution. Injection methods and pulsing structures for the Linac were also discussed,
0 views • 17 slides
ESSnuSB Project - Linac Upgrade for Neutrino Beam Generation
Explore the ESSnuSB project's linac upgrade featuring beam pulsing schemes and modifications, aiming to provide an additional 5 MW of beam power for neutrino generation. The upgrade options, pulse structure, beam parameters at 2.5 GeV, and different pulsing schemes are detailed with images and descr
0 views • 10 slides