Bnl - PowerPoint PPT Presentation


Caterpillar Cat D6R II TRACK-TYPE TRACTOR (Prefix BNL) Service Repair Manual Instant Download

Please open the website below to get the complete manual\n\n\/\/

0 views • 32 slides


Implementing Red Hat Identity Management (IPA) for Improved Identity Management and Access Control

Discover how BNL addressed challenges with individual Kerberos realms by migrating to Red Hat Identity Management (IPA) for streamlined SSO and federated access. Learn about the benefits of IPA architecture, user migration from OpenLDAP, and the successful implementation of IPA in a production envir

2 views • 14 slides



Advancements in Signal Processing for ProtoDUNE Experiment

The team, including Xin Qian, Chao Zhang, and Brett Viren from BNL, leverages past experience in MicroBooNE to outline a comprehensive work plan for signal processing in ProtoDUNE. Their focus includes managing excess noise, addressing non-functional channels, and evolving signal processing techniqu

1 views • 23 slides


Multiatmosphere CO2 Laser Amplification Funded by Department of Energy

A project funded by DOE HEP focuses on developing a multiatmosphere CO2 amplifier optically pumped by a 4.3m Fe:ZnSe laser. The motivation lies in exploring the potential of optically pumped CO2 lasers for generating picosecond pulses at a high repetition rate. The project involves a collaboration b

0 views • 11 slides


Water Leak Incident and Repairs Update at BNL Facility

A water leak was detected in a 35-year-old 1000-gallon water-cooling system at a BNL facility. Repairs are in progress, with two options being pursued. Tritium levels were within safe limits, and no health impacts are anticipated. Regulatory agencies and the Community Advisory Council will be briefe

0 views • 8 slides


Understanding Beam Conditions and Effects in Particle Physics Experiments

Critical accelerator and beam conditions for E.C. Aschenauer's physics research at BNL are discussed, including effects on the main detector, consequences of crossing angle adjustments, important particle beam parameters, and the rotation of the ESR reference plane. Detailed information on beam dive

0 views • 8 slides


Weekly Report on Magnets Vertical Test at BNL - Nov 30, 2020

Building 902 High Bay Magnet Division has started work on various phases including coil fabrication, preparation, and testing. Cryogenics updates mention progress on replacing the heat exchanger with plans for cooldown after New Year. The quench antenna is being shipped for amplifier replacement, an

0 views • 12 slides