Broadband Access Points & Programmable Logic Controllers Replacement Phase 1 Project Overview

Slide Note
Embed
Share

This project overview provides details of the Broadband Access Points & Programmable Logic Controllers Replacement Phase 1 Project led by Jeff Ray, EIT Project Engineer at Treatment & Recycle Engineering. It includes information on the pre-submittal conference, RFQ schedule, evaluation criteria, and key contacts. The project aims to replace access points and PLCs, with specific deadlines and criteria outlined for proposal submission, evaluation, and potential project phases. Important information such as point of contact for questions and evaluation criteria breakdown is highlighted, along with images depicting project-related maps and production sites.


Uploaded on Oct 03, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Broadband Access Points & Programmable Logic Controllers Replacement Phase 1 Project Jeff Ray, EIT Project Engineer, Treatment & Recycle Engineering February 19, 2014 Pre-submittal Conference

  2. February 19, 2014 Introduction Sign attendance sheet Owner: Jeff Ray Project Engineer SAWS Treatment & Recycle Engineering Marc Ripley Contract Administrator SAWS Contracting Page 2 Broadband Access Points & PLCs Replacement Phase 1

  3. February 19, 2014 RFQ Schedule Questions Due February 20, 2014 Proposals Due February 28, 2014 Notification March 28, 2014 SAWS Board Award May 2014 Answers Posted February 24, 2014 Interviews (if necessary) March 2014 Page 3 Broadband Access Points & PLCs Replacement Phase 1

  4. February 19, 2014 Point of Contact for Questions Marc Ripley Contract Administrator Fax: 210-233-3136 E-Mail: mripley@saws.org Contracting Department 2800 US HWY 281 N. San Antonio, TX 78212 Note: SAWS Project Managers and Engineers will not respond to any questions submitted by phone and / or email directly to them Page 4 Broadband Access Points & PLCs Replacement Phase 1

  5. February 19, 2014 Evaluation Criteria Project Team Resumes and Experience in Similar Projects 40 Points Project Approach 30 Points QA / QC and Risk Management 15 Points SMWB Participation 15 Points Page 5 Broadband Access Points & PLCs Replacement Phase 1

  6. February 19, 2014 SAWS Facilities Location Map Legend SAWS Facilities Potential Potable Water Sites This Phase 1 Project Potential Potable Water Sites Future Phase 2 Project Other Sites Not Part of Project Other Sites Not Part of Project Page 6 Broadband Access Points & PLCs Replacement Phase 1

  7. February 19, 2014 Production Site Typical Radio Panel Marbach PW Primary Pump Station Page 7 Broadband Access Points & PLCs Replacement Phase 1

  8. February 19, 2014 Production Site Typical SCADA Panel Commerce St. EMS System Status Screen Commerce St. EMS Trend Screen Market Street PW Primary Pump Station Page 8 Broadband Access Points & PLCs Replacement Phase 1

  9. February 19, 2014 Scope Replace radio communication system w/ communication infrastructure that includes high speed, Ethernet IP radios, antennas, communication towers and backup power including emergency generators and / or uninterruptible power supplies Evaluation of recently constructed broadband backhaul network for purpose of optimizing and interfacing new radio and PLC communications infrastructure to provide secure and reliable communications for approx. 100 existing primary water and booster pump stations and approximately 25 District Special Project (DSP) facilities Page 9 Broadband Access Points & PLCs Replacement Phase 1

  10. February 19, 2014 Scope, Cont. Radio communication system will allow for future remote calibration of field monitoring and control equipment and reduction of time for signals to be received / transmitted for pump stations Conduct radio path study for each site location, and field verify each site location for acceptable signal strength Conduct radio path study to address and correct any issues, including, but not limited to, instances where signal strength is inadequate for proper operation of transmitting data across radio system Conduct radio path studies that include investigation of redundant / alternate paths for each repeater site Page 10 Broadband Access Points & PLCs Replacement Phase 1

  11. February 19, 2014 Scope, Cont. Replacement of radios and PLCs for approximately 100 primary water and booster pump stations, and SCADAPack controllers at approximately 25 District Special Project (DSP) facilities Control Narrative and Performance Spec. may be required Miscellaneous civil site and improvements work Project upgrades to increase efficiency by developing standardized, automated control strategies for starting / stopping pumps based on equipment efficiency, customer demand patterns and energy costs, as well as allow for remote programming of PLCs Page 11 Broadband Access Points & PLCs Replacement Phase 1

  12. February 19, 2014 Questions Page 12 Broadband Access Points & PLCs Replacement Phase 1