Understanding Ceiling Hoists in Domiciliary Equipment Services

Slide Note
Embed
Share

Explore the provision of ceiling hoists, changing trends, and considerations when implementing these assistive technologies in home and work environments. Learn about the South Australian government's equipment services since 1996 and the various factors involved in choosing and installing ceiling hoists.


Uploaded on Nov 24, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Ceiling Hoists: Let s raise the requirements to the ceiling Agnieszka Kuna, Manager Specialist Equipment Services Lisa-Marie Arthur and Matthew Massy-Westropp Domiciliary Equipment Service Department for Communities and Social Inclusion

  2. DES Provision of ceiling hoists Changing trends Risks client, user, funder Equipment vs Home Modification Review of practice Considerations

  3. What is DES? SA government provider since 1996 of: Equipment - readily available and customised Equipment repairs, maintenance and modifications Home modifications - simple to complex Clinical support and technical expertise Centralised warehouse and procurement Focuses on refurbishment of 50,000 loan items = responsive and more efficient

  4. Ceiling hoists What and why? Mobile vs ceiling Gantry vs fixed tracking Portable vs fixed motor Advantages and disadvantages

  5. Ceiling hoist considerations Person Assistive technology Environment

  6. Ceiling hoist considerations Person Person with a disability functional capacity, prognosis Care giver providing assistance consideration of work environment Environment (for installation) Private home vs Work setting Construction requirements and standards Physical limitations and space Ownership of property Assistive technology & Funding Specifications of item Policy of the funder

  7. Context in SA Ceiling vs all hoists 1200 Funding Specific eligibility criteria Numbers of hoists vs ceiling hoist (provide percentage) 1000 800 600 Installation Installed by ceiling hoist suppliers 400 200 Equipment item But is it? 0 FY14 FY15 FY16 FY17 Ceiling All hoists

  8. So what triggered a review? http://activerain.com/blogsview/3573368/funny-friday-s-tgiff-call-it-what-you-like-there-s-a-hole-in-the-roof

  9. Changing trends Reforms Reforms in both ageing and disability Funding changes where equipment impacts care hours. Ability to evaluate life-cycle costs and whole of life costs and effectiveness of items Environmental House and room size Impact on manual tasks for care givers New technology changing functionality of slings and tracking

  10. Risks Incidents related to tracking, straps or use Product failure maintenance schedule and responsibility Construction asbestos, termites, roof trusses and loading Costs associated with re-positioning due to changed needs

  11. Roof trusses and New home construction In 2002 sections of the prefabricated timber roof truss frame at the Riverside Golf Club, in South Australia, collapsed (Raising the roof: a guide to roof truss safety) Prefabricated trusses are used extensively in the building industry It cannot be assumed that roof trusses are capable of supporting additional loads after manufacture Without engineering checks, could lead to failure cartoon renewableenergyworld.com

  12. Is this assistive technology an equipment item or a home modification? What about other items: Bidet (with the required RPZ devices) Electronic door openers

  13. Other considerations Responsibility for ensuring correct installation, ongoing review, programmed maintenance, building structure remains intact, training in use Property Ownership and consent to install ceiling hoist Legislation NCC and AS Work environment (work health safety) Quality service Installation and by whom Engineering checks

  14. Specification forms with sign off from home owner Engineer sign-off Process in place Admin support dedicated to overseeing these Panel of providers Comparison chart & clinical considerations Programmed maintenance What have we done and what do we plan to do?

  15. Thank You! Phone: Repairs: Email: Catalogue: www.des.domcare.sa.gov.au Web: www.des.sa.gov.au 1300 295 786 1300 130 302 des.frontdesk@sa.gov.au

Related


More Related Content