Provide a summary of the holistic review conducted by SPP Staff on the MPEC Tariff, covering both non-substantive and substantive changes made for review and approval by MDWG. The review includes critical dates, tariff outline, updates from working groups/task forces, and a detailed table of contents outlining various attachments related to the tariff.


Uploaded on Jul 05, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. SUMMARY OF HOLISTIC REVIEW MPEC JANUARY 23, 2024 Working together to responsibly and economically keep the lights on today and in the future. SPPorg southwest-power-pool 1 SouthwestPowerPool

  2. PURPOSE Provide MPEC with a summary of SPP Staff s holistic review of the M+ Tariff. ESSENTIAL POINTS Summarize non-substantive changes made during the review Summarize any substantive (or slightly substantive) changes made for review and approval by MDWG 2

  3. ITEMS TO COVER 1. Timeline to Filing/Critical Dates 2. Tariff Outline 3. Working Group/Task Force Updates since December 4. Summary of Changes 3 SPP Public Information

  4. CRITICAL DATES 4 SPP Public Information

  5. TARIFF TABLE OF CONTENTS 15 attachments detailing the services, terms and conditions of Markets+ I. COMMON SERVICE PROVISIONS II. SPECIAL RULES ON USE OF MARKETS+ TARIFF ATTACHMENT A Markets Plus ATTACHMENT B Market Power Mitigation Plan ATTACHMENT C Market Monitoring Plan ATTACHMENT D Markets+ Transmission ATTACHMENT E Market Participant Agreement ATTACHMENT F Form of Non-Disclosure Agreement for Authorized Agencies ATTACHMENT G Meter Agent Agreement ATTACHMENT H Credit Policy ATTACHMENT I Distribution of Other Revenues ATTACHMENT J Allocation of Costs Associated with Penalty Assessments ATTACHMENT K Greenhouse Gas Programs ATTACHMENT L Participating Balancing Authority Agreement ATTACHMENT M Transmission Service Provider Agreement ATTACHMENT N Markets+ Stakeholder Agreement ATTACHMENT O Markets+ Governance Over 100 hours of direct group review time 5 SPP Public Information

  6. WORKING GROUP/TASK FORCE UPDATES SINCE 12/08 POSTED TARIFF VERSION Topic GHG Section(s) Added/Approved Program mechanics and definitions - Attachment K Market Power and Mitigation Scope and Plan - Attachments B & C Source MDWG Approval 1/11/2024 MMU MDWG Approval 1/11/2024 Congestion Rent Allocation M+ IEES Uncommitted Supply Attachment A, 7.16, 9.2.13 - 9.2.15: Congestion Rent MDWG Approval 1/11/2024 Schedule to replace BSS/Internal transactions settlements Attachment A, 7.4: Uncommitted Supply MDWG Approval 1/16/2024 MDWG Approval 1/16/2024 Outage Reporting Attachment A, 6.8: Outage Reporting and Scheduling MDWG Approval 1/16/204 9.2.13-15; 16-19; 10, to include Loss Adjustment Factor 9.2.1 & 9.3.1 Settlements & Billing MDWG Approval 1/19/2024 Attachment L: Balancing Authority Agreement, Attachment M: Transmission Service Provider Agreement, Section II: Special Rules on Use of Tariff, Attachment N: Stakeholder Agreement Legal Agreements MDWG Approval 1/16/2024 6 SPP Public Information

  7. NON-SUBSTANTIVE TARIFF CHANGES (STYLE GUIDE) SPP will be referred to as Market Operator Reference only Minimum Economic Capacity Operating Limit and Maximum Economic Capacity Operating Limit removal of minimum/maximum limits and use of emergency limit (During holistic review we determined that other design choices led to the additional limits being unnecessary resulting in simplified design.) M+ Market Participant will be referred to as Market Participant (MP) Removal of the word shall . Use will or must instead References to SPP/MO use will References to MP use must Refer to tariff as Markets+ Tariff Time in tariff should reference PPT Removal of Service in Agreements Clean up of capitalization to align to definitions Refer to protocols as Markets+ Protocols Clean up use of acronyms and ensure defined before using When referencing sections of tariff use Attachment X, Section xx.xx Clean up of attachment lettering, section numbering, appendix number, etc. Reference FERC instead of Commission and no the Transmission system (t and s not capitalized) 7 SPP Public Information

  8. SUBSTANTIVE TARIFF CHANGES Tariff Section Attch A, 3.7.1 (1) Section Description LMP & MCP during System Outages Changes made Reworded language Reasons for changes Clarified settlements when no DA Market solved (i.e. no congestion rent will be settled) Disconnect between RUC using RT energy offer curves and MOO for RUC. Move language since more settlements focused Recent language added in East/IM related to ER24-270 (RR521) and ER23-2664 (RR543) SPP realized loss adjustment factor needed to be added Attch A, 5.1 Must Offer Requirement Added detail about DA to RUC requirements and moved language to settlements Added language on Non- standard load and DDR Attch A, 6.2 Asset Registration Attch A, 9.2.1 and 9.3.1 DA Energy Amount and RT Energy Amount Added language on Loss Adjustment Factor 8 SPP Public Information

  9. TARIFF CLARIFICATIONS (SLIGHTLY SUBSTANTIVE) Tariff Section Section I, 1 Section Description Definitions Changes made Multiple Reasons for changes General clean up and consistency. Attch A, 2.1.2.2 DA Clearing during Excess Generation Conditions RUC Execution Changed the listing order of actions Changed the listing order of actions Changed the listing order of actions Added FRP and MCPs Made it more explicit that Scarcity Pricing starts and then sequential actions Clarified actions and order Attch A, 2.2.2 Attch A, 2.3.1.2 RTBM Execution Clarified actions and order Attch A, 3.6 Pricing during Scarcity Conditions Impact of Scarcity Pricing on LMP and MCP VERs Clarified to include FRP and MCP during Scarcity Accuracy improvement to what actual happens SPP believe NDVERs will be valid type (still had in definitions) and wanted to call out under VERs Moved language from Appendix 3 Attestation and added belts and suspenders that all M+ load must register. Attch A, 3.6.1 Changes Scarcity Price to value of Demand Curve Added NDVER Attch A, 4.2.4 Attch A, 6.10 LRE Obligation Added language 9 SPP Public Information

  10. TARIFF CLARIFICATIONS (SLIGHTLY SUBSTANTIVE) Tariff Section Attch A, 7.2 and 7.5 (2) Section Description Trading Hubs, Forecasting Changes made Removed language Reasons for changes More appropriate to detail in protocols because these are dynamic concepts with requirements that change. Clarified intent that was any time uncommitted resources could impact increase (even if not cleared in DA Market) SPP felt this was detail to be left in protocol detail and MIP should be responsible not the Board Add detail to clarify why doing MTU. Mistake in language. Twice only needed in denominator. Formula in Appendix 2 correct. Attch A, 7.4 (4) Flex Reserve & Inst Load Capacity Requirements Removed reference to DA Market Attch A, 7.7 and 3.5.2 VRL Reporting Removed date reference and replaced Board with MIP Attch A, 7.11 Attch A, 9.6 (1) MTU MTU Distribution Amount Added clarification language Removed twice from numerator 10 SPP Public Information

  11. QUESTIONS 11