Renovation and Renewal Plan for Unitarian Church in Westport

 
RENEWAL OF YOUR BUILDING
 
Town Hall
 
The Unitarian Church in Westport | 2019.11.3
 
Turner
 
INTRODUCTION – PROCESS RECAP
UPDATES
BUILDING NEEDS
PRIORITY COSTS
CHOICES
NEXT STEPS
 
Turner
 
Creating A Renewal Plan
 
3
 
Identifying All Work
Landscape
Architectural
Envelope
MEPFP
AV
Prioritizing
Triggers (code,
safety, access,
comfort, etc.)
Ranking (1-3)
Benefits & Risks
Programmatic
Impact
User Experience
Sustainability
Risks
 
                    Identifying the Work
     
  Prioritizing
  
               Benefits & Risks
 
Turner
 
Prioritizing Projects
 
4
 
Life Safety
Provide/replace
emergency lighting and
exit signs
Replace skylight
Repair exterior concrete
Replace railings
Replace exposed or
deteriorated wiring
Repair parking lots (and
improve drainage)
Repair exterior service
stair and lighting
 
User Comfort
Heating system
Air conditioning
Exterior glazing
New lighting
New audio
 
 
Enhancements
Photovoltaic installation
Improved entry sequence &
accessibility
Expanded gathering with
designed storage/display
Kinder stair between levels
Renewal/replacement of
aged finishes
Added site lighting
Improved site signage
 
Turner
 
$2.1M
 
Soft Costs
 
Design & Consultant  Fees
Utility Fees
Furniture, Fixtures, Equipment
 
Hard Costs
 
Skylight Replacement
Drainage Improvements
Walkway Repair
 
Total Project Cost
 
Required Scope Items
 
Enhancement Opportunity
 
Exterior Guardrail Replacement
Electrical Infrastructure / Wiring
 
Required Scope for Code & Safety
 
Exterior Stair Repair
Concrete Repairs
Entrance Sign
 
CO Detectors
Exit Signage
 
Turner
 
Enhancement Opportunities
 
Turner
 
1. Photovoltaic Installation
 
Engaged Horizon Solar to create
a feasibility study for the site.
Current usage: 64,000 KWH
Estimated Production:
119,000 KWH
 
7
 
Turner
 
8
 
Turner
 
Pricing /
Investigation
 
Develop standalone
pricing for each menu item
On site investigation
Glazing Contractor
Roofing Contractor
 
 
9
 
RENOVATION OF THE UNITARIAN CHURCH IN WESTPORT | 2019.10.20
 
2. Improved entry sequence
 
10
 
Enhancing First Impressions
 
3. Expanded gathering/welcoming
4. Kinder stair to lower level
 
11
 
Plan Sketch
 
New vestibule
 
Expanded
gathering
w/millwork
Screening
for coats
and
donations
 
Widen and straighten stair
to lower level
 
NEXT STEPS
MEMBERS MEETING
NOVEMBER 24
TH
, 12:30PM
VOTE
 
Turner
Slide Note
Embed
Share

Explore the renovation and renewal project for The Unitarian Church in Westport, focusing on prioritizing work, identifying benefits and risks, and necessary scope items. Learn about enhancing user comfort, safety measures, and potential expansion opportunities to enhance the church building. Follow the project updates and decisions made in the process recap.

  • Renovation
  • Renewal Plan
  • Unitarian Church
  • Westport
  • Building Improvement

Uploaded on Sep 14, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Concept Design The Unitarian Church in Westport | 2019.11.3 RENOVATION OF THE UNITARIAN CHURCH IN WESTPORT Town Hall RENEWAL OF YOUR BUILDING RENEWAL OF YOUR BUILDING Turner

  2. Concept Design RENOVATION OF THE UNITARIAN CHURCH IN WESTPORT INTRODUCTION INTRODUCTION PROCESS RECAP UPDATES UPDATES BUILDING NEEDS BUILDING NEEDS PRIORITY COSTS PRIORITY COSTS CHOICES CHOICES NEXT STEPS NEXT STEPS PROCESS RECAP Turner

  3. Project Update Creating A Renewal Plan Identifying the Work Prioritizing Benefits & Risks Identifying All Work Landscape Architectural Envelope MEPFP AV Prioritizing Triggers (code, safety, access, comfort, etc.) Ranking (1-3) Benefits & Risks Programmatic Impact User Experience Sustainability Risks Turner 3

  4. Project Update Prioritizing Projects Life Safety Provide/replace emergency lighting and exit signs Replace skylight Repair exterior concrete Replace railings Replace exposed or deteriorated wiring Repair parking lots (and improve drainage) Repair exterior service stair and lighting User Comfort Heating system Air conditioning Exterior glazing New lighting New audio Enhancements Photovoltaic installation Improved entry sequence & accessibility Expanded gathering with designed storage/display Kinder stair between levels Renewal/replacement of aged finishes Added site lighting Improved site signage Turner 4

  5. Required Scope Items Exterior Stair Repair Concrete Repairs Entrance Sign Skylight Replacement Drainage Improvements Walkway Repair Required Scope for Code & Safety Hard Costs CO Detectors Exit Signage Exterior Guardrail Replacement Electrical Infrastructure / Wiring Enhancement Opportunity Design & Consultant Fees Utility Fees Furniture, Fixtures, Equipment Soft Costs $2.1M Total Project Cost Turner

  6. Enhancement Opportunities Item Cost Sanctuary Glazing Repair $85,000 Sanctuary Glazing Re-glaze $210,000 Sanctuary Glazing Replacement $450,000 Expansion of Entrance Foyer $150,000 A/C Upper Level $370,000 Hot Water Radiant System Replacement $270,000 Electric Heat Replacement (Sanctuary) $62,000 Audio System w/ Hearing System $20,000 Security / Surveillance $42,000 Improved Bluestone Plaza $90,000 Shingle Roof Replacement $500,000 - $750,000 Renewed Stair to Lower Level $70,000 Infrastructure for PV $21,000 Turner

  7. Project Update 1. Photovoltaic Installation Engaged Horizon Solar to create a feasibility study for the site. Current usage: 64,000 KWH Estimated Production: 119,000 KWH Turner 7

  8. Project Update Turner 8

  9. Project Update Pricing / Investigation Develop standalone pricing for each menu item On site investigation Glazing Contractor Roofing Contractor RENOVATION OF THE UNITARIAN CHURCH IN WESTPORT | 2019.10.20 9

  10. Project Update 2. Improved entry sequence Enhancing First Impressions 10

  11. Project Update Expanded gathering w/millwork Screening for coats and donations 3. Expanded gathering/welcoming 4. Kinder stair to lower level New vestibule Widen and straighten stair to lower level Plan Sketch 11

  12. Concept Design RENOVATION OF THE UNITARIAN CHURCH IN WESTPORT NEXT STEPS NEXT STEPS MEMBERS MEETING MEMBERS MEETING NOVEMBER 24 NOVEMBER 24TH VOTE VOTE TH, 12:30PM , 12:30PM Turner