Optimizing Hazard Control Outputs for NIOSH

project keyword in three words l.w
1 / 5
Embed
Share

"Explore a project aiming to enhance hazard control outputs directly usable in industry and by NIOSH. Utilize existing NIOSH facilities and instruments effectively to boost safety measures."

  • Project
  • Hazards
  • NIOSH
  • Safety
  • Industry

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. < project keyword in three words> 1. The title, team member, problem statements, objectives (2 min) (Add more slide if needed) The output that can be used directly for hazard control; AND The output able to used by NIOSH to assist the industry through its functions Utilisation of existing NIOSH facilities, laboratories & scientific instruments. <Slide no. #>

  2. < project keyword in three words> 2. Method & instrument used (3 min) (Add more slide if needed) <Slide no. #>

  3. < project keyword in three words> 3. Direct output & benefit to NIOSH functions (2 min) (Add more slide if needed) Tick Project Main Criteria The output that can be used directly for hazard control; AND The output able to used by NIOSH to assist the industry through its functions Utilisation of existing NIOSH facilities, laboratories & scientific instruments. <Slide no. #>

  4. < project keyword in three words> 4. Summary table of objective-method-output (2min) METHOD INVOLVED (SUMMARY) OBJECTIVE DIRECT OUTPUT < Objective 01 > < method > < output > < Objective 02 > < method > < output > < Objective 03 > < method > < output > < Objective 04 > < method > < output > <Slide no. #>

  5. < project keyword in three words> 5. Proposed Budget & Other (1 min) (Add more slide if needed) Expense Category Travelling (8-07-02-0100) Accommodations (8-07-02-0200) Rentals of equipment (8-07-03-0000) Research materials & supplies (8-07-04-0000) Minor modifications & repairs (8-07-05-0000) Special services expert (8-07-06-0000) R&D equipment & accessories (8-07-07-0000) Workshop/Meeting (8-07-08-0000) Total Total (RM) Details <Slide no. #>

More Related Content