Optimizing Airline Operations for Maximized Profitability
AJV, an airline company operating in Africa, aims to reduce costs and increase profits by minimizing airplane turnaround time at different cities. By analyzing arrival and departure schedules, required planes, and flight operation times, the company can efficiently allocate resources to achieve optimal performance and profitability.
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
E N D
Presentation Transcript
PREPARED BY: Virtue. Marylee. Mugurachani
AJV is an airline company operating between 4 different cities around the world, mainly Africa. AJV is facing cut throat competition from other airlines within and around the globe and would like to cut back on its costs while increasing profits. In order to maximize its profitability, one way to achieve this objective is to minimize the airplane s turnaround time. Turnaround time is the time that is measured in terms of the time that is between the plane s arrival and its departure. Factors included in the airplane s turnaround time are engineering checkup, baggage unload, baggage loading etc. The airline would want to choose airport with low airplane congestion. Suppose for each city: between Johannesburg and Gaborone 1 plane is required, Harare and Istanbul 3 and Istanbul and Harare 2 planes. The capacity of each plan is 350 people. The following table shows the time at which AJV planes are expected to arrive at terminal gates in the city airports listed below: AJV Ltd Company AJV Ltd Company
HR INST JBR GB 11:25 20:15 15:35 15:00 HR 23:41 9:05 21:05 19:50 INST 10:55 03:41 09:19 12:05 JBR 13:16 00:15 18:30 10:50 GB
Suppose the flight requires 20minutes for landing, 25 minutes for takeoff, 75 minutes (passengers checking process, baggage off and on load and engineering checkup, fueling, catering and cleanup) How can AJV minimize its costs and how many airplanes are re required at each destination?
JBR GB 1 HR INST 3 INST HR 2 Xij the number of airplanes from airport origin i to destination airport j Turnaround time + travelling time from route i to route j (in minutes) SOLUTION
MIN 572X11 + 432x12 +1091x12 + 1226X21 + 650X22 + 650X23 + 1444X31 + 914X32 + 914X33 S.T X11 +X12 + X13 X21 +X 22 +X23 X21 +X 22 +X23 X11 + X21 + X31 = 1 X12 + X22 + X32 = 3 X13 + X23 + X33 = 2 = 1 = 3 = 2 Xij <= 350 X11, X12 , X13 , X21 ,X 22 ,X23 , X21 ,X 22 ,X23 >= 0