New Gorbals Health and Care Centre Overview

 
Glasgow City HSCP
 
New Gorbals Health and Care Centre
 
 
Hamish Battye, Head of Planning and Strategy,
Older People and South Locality
 
Lisa Martin
Community Engagement Officer
 
December 2018
 
Current Position
 
 
 
Building was handed over on Tuesday 6th November 2018
 Planned opening date is Monday 21
st
 January 2019
 Handover period to deal with any ‘snagging issues’
 
Address: 
 
New Gorbals Health and Care Centre
  
2 Sandiefield Road
  
Glasgow
  
G5 9AB
 
Telephone number for main Reception: 0141  201 5000
 
Services
 
 
 
All services in the current  Gorbals Health Centre including:
 
 
GP practices, dental practices, treatment room services, physiotherapy,
 
podiatry, district nursing, health visiting, speech and language therapy
 
and other clinics such as dietetics, community mental health services
 
and others
 
All services in the current Two Max Building including:
 
Children and Families tea, Homelessness Team, Alcohol and Drug Recovery
 
Service and Criminal Justice Team
 
All services in the current South Bank Centre including:
 
Specialist Children’s Services, CAMHS and Community Paediatrics
 
Ground Floor Plan
 
 
First Floor Plan
 
 
 
 
 
 
External Elevation
 
Left: Front Entrance
 
Above: Sign
 
Above: Corner elevation above Alcohol and Drug Recovery Service
 
        Above: Controlled access at Sandiefield Road
 
 
 
 
Internal Images
 
Left: Main stairwell
 
Above: 2
nd
 Floor corridor
 
Far left:
Internal signage
 
 
 
 
 
Left:
Standard
Clinical Room
 
Left: Main Atrium
 
Above: Courtyard View
 
 
 
Transport, Parking and Access
 
Travel Plan sets out how we will support visitors and staff to consider
active and alternative travel to the Centre
On site secure bike parking for visitors and staff
Electric bikes for staff
Electric car charging space
Local public transport options highlighted to all staff
Parking Plan in place to manage the 75 available spaces
Disabled spaces at the front of the building
 Discussions with Co-op re: access to spaces in car park on-going
 
 
 
 
 
Publicity and Communications
 
Open evening and site visits being planned in lead up to the opening
on 21
st
 January 2019
Newsletter being published in December 2018 with all the
information patients, users and the wider public will need to access
the new building
Articles in HSCP newsletter, NGHA newsletter and local websites
Social media – follow us on Twitter @gorbalscentre
 
Ministerial opening to take place sometime in early Spring (date
pending)
 
Discussion
 
 
Your comments/feedback/questions.
Thank you.
 
 
 
 
Slide Note
Embed
Share

New Gorbals Health and Care Centre, managed by Glasgow City HSCP, offers a wide range of health services including GP practices, dental care, physiotherapy, mental health services, and more. The facility was handed over in November 2018 with a planned opening date in January 2019. Address: 2 Sandiefield Road, Glasgow G5 9AB. Current services from Gorbals Health Centre, Two Max Building, and South Bank Centre will be consolidated at this new state-of-the-art facility. The building features various floors including ground and first with services like specialist children's services and CAMHS. The design includes modern interiors, controlled access points, and ample parking options. A travel plan has been developed to facilitate easy access for visitors and staff.

  • Health services
  • Glasgow City HSCP
  • New Gorbals
  • Care Centre
  • Healthcare

Uploaded on Sep 08, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Glasgow City HSCP New Gorbals Health and Care Centre Hamish Battye, Head of Planning and Strategy, Older People and South Locality Lisa Martin Community Engagement Officer December 2018

  2. Current Position Building was handed over on Tuesday 6th November 2018 Planned opening date is Monday 21st January 2019 Handover period to deal with any snagging issues Address: New Gorbals Health and Care Centre 2 Sandiefield Road Glasgow G5 9AB Telephone number for main Reception: 0141 201 5000

  3. Services All services in the current Gorbals Health Centre including: GP practices, dental practices, treatment room services, physiotherapy, podiatry, district nursing, health visiting, speech and language therapy and other clinics such as dietetics, community mental health services and others All services in the current Two Max Building including: Children and Families tea, Homelessness Team, Alcohol and Drug Recovery Service and Criminal Justice Team All services in the current South Bank Centre including: Specialist Children s Services, CAMHS and Community Paediatrics

  4. Ground Floor Plan

  5. First Floor Plan

  6. External Elevation Left: Front Entrance Above: Sign

  7. Above: Corner elevation above Alcohol and Drug Recovery Service Above: Controlled access at Sandiefield Road

  8. Internal Images Above: 2nd Floor corridor Left: Main stairwell

  9. Far left: Internal signage Left: Standard Clinical Room

  10. Left: Main Atrium Above: Courtyard View

  11. Transport, Parking and Access Travel Plan sets out how we will support visitors and staff to consider active and alternative travel to the Centre On site secure bike parking for visitors and staff Electric bikes for staff Electric car charging space Local public transport options highlighted to all staff Parking Plan in place to manage the 75 available spaces Disabled spaces at the front of the building Discussions with Co-op re: access to spaces in car park on-going

  12. Publicity and Communications Open evening and site visits being planned in lead up to the opening on 21st January 2019 Newsletter being published in December 2018 with all the information patients, users and the wider public will need to access the new building Articles in HSCP newsletter, NGHA newsletter and local websites Social media follow us on Twitter @gorbalscentre Ministerial opening to take place sometime in early Spring (date pending)

  13. Discussion Your comments/feedback/questions. Thank you.

Related


More Related Content

giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#