ERCOT Meter Working Group Update November 2024

meter working group update n.w
1 / 5
Embed
Share

Stay updated with the latest discussions and decisions of the ERCOT Meter Working Group in November 2024. Topics include loss compensation methodology, current limiting reactors, and generation netting for ERCOT-polled settlement meters. Join the conversation and learn about upcoming leadership discussions for 2025.

  • ERCOT
  • Meter Working Group
  • Update
  • November
  • Discussion

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Meter Working Group Update November 20, 2024

  2. SMOGRR028 Discussion (Loss Comp. Current Limiting Reactors) ERCOT presented comments to SMOGRR028 and posted the revised language on the Nov 20th MWG meeting webpage. Changes reflect Loss Compensation methodology discussed at 4/30 MWG ERCOT clarified projects that utilized initially proposed loss compensation methodology could continue to do so until the new language has been adopted Stakeholders reviewing proposed changes for discussion at Dec MWG. Scenarios were presented illustrating when Loss Compensation for Current Limiting Reactors would or wouldn t be required. 2 PUBLIC 12/6/23 MWG to WMS PUBLIC - 12/3/24 MWG TO WMS

  3. NPRR1200 Discussion (Loss Comp. Current Limiting Reactors) MWG maintained previous position that SMOGRR028 is the better technical solution. MWG was informed by NextEra Energy that the Submitter is no longer with the company but they will review their position and consider withdrawing NPRR1200. 3 PUBLIC 12/6/23 MWG to WMS PUBLIC - 12/3/24 MWG TO WMS

  4. Generation Netting for ERCOT-Polled Settlement Meters Eolian presented on possible changes to the transferable load limit from Protocol 10.3.2.3(6). Multiple TDSPs brought up concerns on using EPS meters at both transmission and distribution levels due to netting for a single facility. There was no objection during the discussion to allowing the 500 kW limit to be raised. Eolian will discuss internally and consider submitting a NPRR 4 PUBLIC 12/6/23 MWG to WMS PUBLIC - 1/10/24 MWG TO WMS PUBLIC - 12/3/24 MWG TO WMS

  5. Other MWG Discussion 2025 Leadership Next MWG will be scheduled for December 2024 to discuss SMOGRR028. 5 PUBLIC 12/6/23 MWG to WMS PUBLIC - 1/10/24 MWG TO WMS PUBLIC - 12/3/24 MWG TO WMS