Draft Regulation on Connectivity & GNA Key Observations

Draft Regulation on Connectivity & GNA Key Observations
Slide Note
Embed
Share

Analyzing the challenges and proposals in the draft regulation on connectivity and general network access (GNA). Discussions on inter-regional capacity, issues impacting entities covered under the regulation, proposed solutions, and more.

  • Regulation
  • Connectivity
  • GNA
  • Observations

Uploaded on Mar 05, 2025 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Draft Regulation on Connectivity & GNA Key Observations 07-03-2022 Sharat Ranjan - Ayana Renewable Power Pvt Ltd 1

  2. GNA Concept Inter Regional Capacity (MW) 112250 120000 100000 75050 80000 47900 60000 37200 27150 40000 20000 0 IR at end of 2012 IR at end of 2017 IR at end of Jan 2022 IR Capacity IR addition There is Peak deficit in Summer Peak, Winter Peak and Monsoon Peak in Northern Region and Southern Region which leads to congestion in Corridor. The inter regional total transmission capacity (TTC) is 105,050 MW as on 30th Jan 2022. However, the available transmission capacity (ATC) on daily basis is not exceeding 35% of TTC and the actual usage is around 25%. Why GNA is restricted to Regions when the usage is so less Total Inter- regional capacity target is 1,26,650 MW at end of 13th plan (2017-22) and the achievement is 83% 2

  3. GNA Issues impacting Issues Entities covered under Regulation 4.1 and clause (iii) of Regulation 17.1 of these regulations shall furnish one-time GNA charge for Rs. One lakh per MW for the quantum of GNA one month prior to the start date of GNA. Proposed Solutions It should not be applicable to existing Connectivity holders and that transition to GNA should happen without any commercial impact. Quantum of Connectivity for Round the Clock Bids and Peak Power Requirement Bids Hon'ble commission may provide the clarification on the same. We propose it to be Maximum injection quantity to ISTS. Any augmentation required, excluding terminal bay(s), to the existing ISTS identified under Regulation 6.1 of these regulations, shall be considered as the Associated Transmission System (ATS) for the Applicant(s). Associated Transmission System should be identified in advance for each of the substation so that the Generators are aware of the additional charges/BG charges required for the connectivity 3

  4. GNA Issues impacting Issues (a) All the State DISCOMs connected to ISTS will be considered as deemed grantee of GNA, and the GNA of a State on the date the 2021 Draft GNA Regulations come into force, shall be based on average of actual ISTS drawal during the last three years as per the proposed formula since the drawal represents the usage of ISTS by the State. Proposed Solutions As the Demand of the states are going to go up on the coming years due to multiple reasons, the GNA of the states can be considered on higher side to accommodate and meet the extra demand coming from the other segments Connectivity Bank Guarantee shall be submitted by an Applicant in three parts, Conn-BGl amounting to Rs. 50 lakhs, and Conn-BG2 and Conn-BG3, as provided in Regulations 8.2 and 8.3 of these regulations. We propose to remove the requirement of ConnBG 2 where the PPA signing entity is Central Govt. Entity/ Central Govt. REIA (SECI/NTPC/NHPC) or a State Govt. Entity/ State DISCOM/ Distribution Licensee 4