Caterpillar Cat D8K TRACK-TYPE TRACTOR Dozer Bulldozer (Prefix 76V) Service Repair Manual Instant Download
Please open the website below to get the complete manualnn//
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
E N D
Presentation Transcript
Service Repair Manual Models D8K TRACK-TYPE TRACTOR
D8K TRACTOR / DIRECT DRIVE / 76V00001-00504 (MACHINE)(UEG0893S - 00... 1/9 Shutdown SIS Previous Screen Product: TRACK-TYPE TRACTOR Model: D8K TRACK-TYPE TRACTOR 76V Configuration: D8K TRACTOR / DIRECT DRIVE / 76V00001-00504 (MACHINE) Disassembly and Assembly 173, 183, 193 HYDRAULIC CONTROLS Media Number -SENR7008-02 Publication Date -01/10/1980 Date Updated -12/10/2001 Dozer Control Valve SMCS - 5076-15; 5076-16 Disassemble Dozer Control Valve 1. Remove detent plugs (1), springs (2), seats (3) and balls (4). NOTE: There are two of these detents, 180 opposite of each other on housing (5). 2. Remove four bolts from housing (5) and remove housing from valve body. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis... 2019/12/28
D8K TRACTOR / DIRECT DRIVE / 76V00001-00504 (MACHINE)(UEG0893S - 00... 2/9 3. Remove four bolts from control lever housing (6) and remove housing from valve body. 4. Carefully remove spool valve (7) from valve body. NOTE: Spool must be removed from body through the detent end. 5. Remove two plugs, (8) and (12) from the valve body. Remove shims (in the plugs), pistons (9), springs (10) and valves (11) from the valve body. NOTE: The plugs are marked with the pressure setting for the respective valve. 6. Remove four bolts from cover (13) and remove from valve body. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis... 2019/12/28
https://www.ebooklibonline.com Hello dear friend! Thank you very much for reading. Enter the link into your browser. The full manual is available for immediate download. https://www.ebooklibonline.com
D8K TRACTOR / DIRECT DRIVE / 76V00001-00504 (MACHINE)(UEG0893S - 00... 3/9 7. Remove spring (14) and valve (15). NOTE: This is the relief valve for the tilt circuit. 8. Remove springs (17) and (18) and valve (16). NOTE: This is the dump valve for the main relief valve. 9. Remove four bolts from valve body (19) and remove body from valve group. 10. Remove, inspect and clean shuttle valve (37) and resolver valve (38). 11. Remove four bolts from end cover (20) and remove cover from valve body. NOTE: There is a small amount of tension on the spring behind the cover. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis... 2019/12/28
D8K TRACTOR / DIRECT DRIVE / 76V00001-00504 (MACHINE)(UEG0893S - 00... 4/9 12. Remove springs (22) and (23), sleeve (21) and spool (24) from valve body. NOTE: There are two more springs and a sleeve on the opposite end of spool (24). Remove these too. 13. Remove sleeve (27), spring (26) and valve (25). NOTE: There is another sleeve, spring and valve on the other side of the valve. Remove these too. These are make-up valves for the tilt circuit. 14. Remove plug (31), spring (30) and valve (29) from body of valve. NOTE: This is a make-up valve for the dozer lift. The other make-up valve is located under plug (28). Remove it too. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis... 2019/12/28
D8K TRACTOR / DIRECT DRIVE / 76V00001-00504 (MACHINE)(UEG0893S - 00... 5/9 15. Use a 1/4 inch hex wrench to remove bolt (36) from the end of spool (7). Take the bolt out carefully because of force by spring (34) behind retainer (35). Remove retainer (35) spring (34) retainer (33) and washer (32) from the valve spool. Assemble Dozer Control Valve 1. Install washer (32), retainer (33), spring (34) and retainer (35) on spool (7). Put 9S3263 Thread Lock Compound on threads of bolt (36) and install into spool. 2. Install valve (29), spring (30) and plug (31) into valve body. Do this for two valves. Second valve is behind plug (28). https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis... 2019/12/28
D8K TRACTOR / DIRECT DRIVE / 76V00001-00504 (MACHINE)(UEG0893S - 00... 6/9 3. Install valve (25), spring (26) and sleeve (27). Be sure and use a new O-ring seal on the sleeve. Do this for two valves, one on each side of the body. NOTE: Do not push the sleeve in even with the valve body. 4. Install valve spool (24) for tilt circuit. Install retainer (21) and springs (22) and (23). Install O- ring in cover (20). 5. Use four bolts and assemble cover (20) to the valve body. This will cause the valve in Step 3 to become flush with the valve body. 6. Install shuttle valve (39) and resolver valve (40) in body. 7. Install O-rings in body and assemble to valve body with four bolts. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis... 2019/12/28
D8K TRACTOR / DIRECT DRIVE / 76V00001-00504 (MACHINE)(UEG0893S - 00... 7/9 8. Put SAE oil on the valves. Install tilt relief valve (15) in the valve body. Install spring (14) in valve (15). Install dump valve (16) for the main relief valve in the valve body. Install springs (17) and (18) in the bore in dump valve (16). 9. Install seal (38) for the pilot valve of the tilt relief valve and seal (37) for the pilot valve of the dozer relief valve. Install O-rings. 10. Install cover (13) with four bolts. 11. Install valve (11), piston (9), spring (10), shims and plug (12) in the bore for the tilt relief valve. The plug that is marked 2500 psi is the plug for the tilt relief valve. The plug marked 2400 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis... 2019/12/28
D8K TRACTOR / DIRECT DRIVE / 76V00001-00504 (MACHINE)(UEG0893S - 00... 8/9 psi is for the main relief valve. Install the valve, piston, spring, shims and plug (8) for the main relief valve. 12. Put SAE 10 oil on spool (7). Install spool (7) in the valve body. NOTE: Spool (7) for the control valve must be installed from the detent end. 13. Install control lever housing (6) with four bolts. Be sure that the pawls on the lever engage the spool correctly. 14. Install housing (5) over the end of spool (7). Fasten the housing to the valve body with four bolts. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis... 2019/12/28
D8K TRACTOR / DIRECT DRIVE / 76V00001-00504 (MACHINE)(UEG0893S - 00... 9/9 15. Install ball detents (4), seat (3), spring (2) and plug (1) in housing (5). Be sure the O-ring seal is on plug (1) before installation. NOTE: There are two detents in housing (5). Do the procedure above for the other detent. The chamfer side of seat (3) goes down against ball (4). Copyright 1993 - 2019 Caterpillar Inc. Sat Dec 28 22:56:31 UTC+0800 2019 All Rights Reserved. Private Network For SIS Licensees. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis... 2019/12/28
D8K TRACTOR / DIRECT DRIVE / 76V00001-00504 (MACHINE)(UEG0893S - 00... 1/4 Shutdown SIS Previous Screen Product: TRACK-TYPE TRACTOR Model: D8K TRACK-TYPE TRACTOR 76V Configuration: D8K TRACTOR / DIRECT DRIVE / 76V00001-00504 (MACHINE) Disassembly and Assembly 173, 183, 193 HYDRAULIC CONTROLS Media Number -SENR7008-02 Publication Date -01/10/1980 Date Updated -12/10/2001 Pilot Valve Group SMCS - 5076-15; 5076-16 Disassemble Pilot Valve Group NOTICE Before pilot valve group (1) is removed from the tractor, be sure that all the pressure in the system has been released. Disconnect the linkage and oil lines and remove the valve from the machine. 1. Remove three bolts (2) from valve body (1). 2. With the removal of bolts (2), the group can now be divided into pilot valve (6) for dozer tilt control, pilot valve (5) for ripper lift control, pilot valve (4) for ripper tip control and two end manifolds (3) and (7). https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis... 2019/12/28
D8K TRACTOR / DIRECT DRIVE / 76V00001-00504 (MACHINE)(UEG0893S - 00... 2/4 3. Remove the bolts that hold cover (8) on the end opposite the shaft end of the valve. Remove cover (8). Carefully remove spool (9) from body (5). NOTE: The pilot valve in the illustration is used on the ripper lift or ripper tip control. 4. Carefully put spring (11) under compression. Remove retainers (10) from the valve spool. Slowly release the compression on spring (11). 5. Remove two bolts holding cover (12) to body (5). Remove the cover. NOTE: There is a seal in cover (12). Check this seal for damage. If the seal is damaged, replace with a new one. Do not remove the seal if it is not damaged. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis... 2019/12/28
D8K TRACTOR / DIRECT DRIVE / 76V00001-00504 (MACHINE)(UEG0893S - 00... 3/4 6. Remove plug (13) from the end of the spool. This will open a passage to the small hole (14). Check the seal on plug (13). 7. Do Steps 2 through 5 for the other two valves. NOTE: There is no plug (Step 6) in the end of the spool for the control valve for dozer tilt. Assemble Pilot Valve Group 1. If necessary, install a new shaft seal in cover (12) on the shaft end of the valve. 2. Install a new O-ring on plug (13) and install in the end of spool (14). Be sure that the passage in spool (14) is open. 3. Put a new O-ring seal in the housing and install cover (12) on the end of the body. 4. Assemble the valve spool with retainers and spring. 5. Install spool (9) in the valve body. Put the spool in oil for easier installation. 6. Do Steps 1 through 5 for the other valves. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis... 2019/12/28
D8K TRACTOR / DIRECT DRIVE / 76V00001-00504 (MACHINE)(UEG0893S - 00... 4/4 7. Assemble the valves in correct order. Install three bolts (2) through the end manifold, the valves and the remaining manifold. Tighten bolts. Be sure not to cut an O-ring seal between each part. Copyright 1993 - 2019 Caterpillar Inc. Sat Dec 28 22:57:30 UTC+0800 2019 All Rights Reserved. Private Network For SIS Licensees. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis... 2019/12/28
D8K TRACTOR / DIRECT DRIVE / 76V00001-00504 (MACHINE)(UEG0893S - 00... 1/3 Shutdown SIS Previous Screen Product: TRACK-TYPE TRACTOR Model: D8K TRACK-TYPE TRACTOR 76V Configuration: D8K TRACTOR / DIRECT DRIVE / 76V00001-00504 (MACHINE) Disassembly and Assembly 173, 183, 193 HYDRAULIC CONTROLS Media Number -SENR7008-02 Publication Date -01/10/1980 Date Updated -12/10/2001 Ripper Control Valve SMCS - 5076-15; 5076-16 Disassemble Ripper Control Valve NOTICE Before the ripper control valve is removed from the machine, be sure that all of the pressure in the system has been released. Disconnect the pilot lines and pressure lines from the main system and remove the valve assembly. 1. Remove valve seat (1), check valve (2), spring (3) and check valve (4). https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis... 2019/12/28
D8K TRACTOR / DIRECT DRIVE / 76V00001-00504 (MACHINE)(UEG0893S - 00... 2/3 2. Remove six bolts (5) and separate the valve groups. 3. Remove two bolts from end housing (6). Remove these bolts carefully because of spring force behind the housing. Remove end housing (6), spring (8), and retainer (7). 4. Remove spool (9). 5. Do Steps 3 and 4 for the housing (10), spring (13), retainer (12) and spool (11) in the other valve group. Assemble Ripper Control Valve 1. Install spool (11) in valve body. Put SAE 10 oil on the spool before installation. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis... 2019/12/28
D8K TRACTOR / DIRECT DRIVE / 76V00001-00504 (MACHINE)(UEG0893S - 00... 3/3 2. Put spring (13) in housing (10). Put retainer (12) over spring (13). Put the assembly in place over the end of spool (11). Install two bolts and tighten as much as possible by hand. Finish tighten bolts with a wrench. Be careful not to cut the O-ring seal between the housing and the valve body. 3. Assemble the other valve group in the same way. 4. Be sure that seals (14) are in the valve body. Put the two parts together and install the six bolts. Tighten the bolts. Be careful not to cut the O-rings between the valve bodies. 5. Install valve (4), spring (3) and valve (2) in the valve body. Make sure the O-ring seal on seat (1) is correctly installed. Carefully install seat (1) in the body. Copyright 1993 - 2019 Caterpillar Inc. Sat Dec 28 22:58:29 UTC+0800 2019 All Rights Reserved. Private Network For SIS Licensees. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis... 2019/12/28
D8K TRACTOR / DIRECT DRIVE / 76V00001-00504 (MACHINE)(UEG0893S - 00... 1/3 Shutdown SIS Previous Screen Product: TRACK-TYPE TRACTOR Model: D8K TRACK-TYPE TRACTOR 76V Configuration: D8K TRACTOR / DIRECT DRIVE / 76V00001-00504 (MACHINE) Disassembly and Assembly 173, 183, 193 HYDRAULIC CONTROLS Media Number -SENR7008-02 Publication Date -01/10/1980 Date Updated -12/10/2001 Pressure Control Valve SMCS - 5050-15; 5050-16 Disassemble Pressure Control Valve NOTICE Before the pressure control valve is removed from the machine, be sure that all of the pressure in the system has been released. Disconnect the pump line and pilot lines, and remove the valve assembly. 1. Remove cover (1) from valve body. Be careful when removing the cover, because there is spring force behind the cover. 2. Remove three springs (2), (3) and (4) from the bores in the valve body. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis... 2019/12/28
Suggest: If the above button click is invalid. Please download this document first, and then click the above link to download the complete manual. Thank you so much for reading
D8K TRACTOR / DIRECT DRIVE / 76V00001-00504 (MACHINE)(UEG0893S - 00... 2/3 3. Remove valves (5) and (6). NOTE: The larger valve will have shims in it. 4. Remove plug (7), spring (8) and ball check (9). NOTE: There is another ball check valve in the cover. Remove it too. Keep the parts of the two ball checks separate. They must be installed in the same bore from which they were removed. Assemble Pressure Control Valve 1. Install the ball check valves, springs and plugs. NOTE: Be sure to get the ball checks back in their respective bores. These groups are different and can not be mixed. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sis... 2019/12/28
https://www.ebooklibonline.com Hello dear friend! Thank you very much for reading. Enter the link into your browser. The full manual is available for immediate download. https://www.ebooklibonline.com