Caterpillar Cat 330D2 L Excavator (Prefix PTE) Service Repair Manual Instant Download

service repair manual l.w
1 / 28
Embed
Share

Please open the website below to get the complete manualnn//


Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. Service Repair Manual Models 330D2L Excavator

  2. w 1/4(W) Shutdown SIS Previous Screen Product: EXCAVATOR Model: 330D2 L EXCAVATOR PTE Configuration: 330D2 L Excavators PTE00001-UP (MACHINE) POWERED BY C7.1 Engine Disassembly and Assembly C7.1 Engines Media Number -UENR0633-19 Publication Date -01/07/2015 Date Updated -29/10/2018 i05292421 Turbocharger - Remove - Turbocharger for Side Mounted Engines SMCS - 1052-011 Removal Procedure NOTICE Keep all parts clean from contaminants. Contaminants may cause rapid wear and shortened component life. NOTICE Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids. Dispose of all fluids according to local regulations and mandates. Note: Plug and cap all open ports and tube assemblies. 1. Disconnect the hose assemblies from the turbocharger inlet and the turbocharger outlet. Refer to the Original Equipment Manufactures (OEM) for the correct procedure. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/21

  3. w 2/4(W) 2. Disconnect the exhaust tube assembly. Refer to the OEM for the correct procedure. 3. If the turbocharger has an exhaust elbow, remove the exhaust elbow. Refer to Disassembly and Assembly, "Exhaust Elbow - Remove and Install" for the correct procedure. Illustration 1 g03376116 4. Slide clip (9) along hose (10). Disconnect the hose from the actuator. 5. Follow Step 5.a through Step 5.d in order to remove tube assembly (4) from turbocharger (1). a. Remove bolt (5). b. Remove banjo bolt (2) and remove sealing washers (3) (not shown). c. Remove tube assembly (4) from the cylinder block. d. Remove O-ring seal (7) (not shown). https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/21

  4. https://www.ebooklibonline.com Hello dear friend! Thank you very much for reading. Enter the link into your browser. The full manual is available for immediate download. https://www.ebooklibonline.com

  5. w 3/4(W) 6. Follow Steps 6 through 6.d in order to remove tube assembly (11) from turbocharger (1). a. Remove bolts (8). b. Remove bolts (12). c. Remove tube assembly (11) from turbocharger (1) and the cylinder block. d. Remove gasket (6) (not shown) and gasket (13) (not shown). Illustration 2 g03376117 7. Remove nuts (16) from turbocharger (1). Remove turbocharger (1) from exhaust manifold (14). Note: Ensure that the weight of the turbocharger is supported as the nuts are loosened. 8. If necessary, remove studs (15) from exhaust manifold (14). https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/21

  6. w 4/4(W) Copyright 1993 - 2020 Caterpillar Inc. Sun Jun 21 15:41:35 UTC+0800 2020 All Rights Reserved. Private Network For SIS Licensees. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/21

  7. w 1/4(W) Shutdown SIS Previous Screen Product: EXCAVATOR Model: 330D2 L EXCAVATOR PTE Configuration: 330D2 L Excavators PTE00001-UP (MACHINE) POWERED BY C7.1 Engine Disassembly and Assembly C7.1 Engines Media Number -UENR0633-19 Publication Date -01/07/2015 Date Updated -29/10/2018 i05292425 Turbocharger - Remove - Turbocharger for Top Mounted Engines SMCS - 1052-011 Removal Procedure NOTICE Keep all parts clean from contaminants. Contaminants may cause rapid wear and shortened component life. NOTICE Care must be taken to ensure that fluids are contained during performance of inspection, maintenance, testing, adjusting and repair of the product. Be prepared to collect the fluid with suitable containers before opening any compartment or disassembling any component containing fluids. Dispose of all fluids according to local regulations and mandates. Note: Plug and cap all open ports and tube assemblies. 1. Disconnect the hose assemblies from the turbocharger inlet and the turbocharger outlet. Refer to the Original Equipment Manufactures (OEM) for the correct procedure. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/21

  8. w 2/4(W) 2. Disconnect the exhaust tube assembly. Refer to the OEM for the correct procedure. 3. If the turbocharger has an exhaust elbow, remove the exhaust elbow. Refer to Disassembly and Assembly, "Exhaust Elbow - Remove and Install" for the correct procedure. Illustration 1 g03374196 4. Slide clip (2) along hose (3). Disconnect the hose from actuator (1). 5. Remove bolts (6) from the clip for tube assembly (5). Position the tube assembly away from cylinder block. 6. Remove bolt (7) and spacer (8) (not shown). https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/21

  9. w 3/4(W) 7. Remove bolt (12) and spacer (13). 8. Remove bolt (10) from tube assembly (9). 9. Remove tube assembly (9) from the cylinder block. Remove O-ring seal (11) (not shown). 10. Remove bolts (15) from tube assembly (14). Remove gasket (16) (not shown). 11. Remove exhaust manifold (4) and the assembly of the turbocharger from the cylinder head. Refer to Disassembly and Assembly, "Exhaust Manifold - Remove and Install" for the correct procedure. Illustration 2 g03374197 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/21

  10. w 4/4(W) 12. Place exhaust manifold (4) and the assembly of turbocharger (19) in a suitable support. 13. Remove banjo bolt (17) and remove sealing washers (18) (not shown). 14. Remove tube assembly (9) from turbocharger (4). 15. Remove bolts (23) from tube assembly (14). Support the tube assembly as the bolts are removed. 16. Remove gasket (21) (not shown). 17. Prior to and during removal of nuts (20) apply releasing fluid to the bolts. Remove nuts (20). 18. Remove turbocharger (19) from exhaust manifold (4). 19. Remove spacer (22). 20. If necessary, remove studs (24) from exhaust manifold (4). Copyright 1993 - 2020 Caterpillar Inc. Sun Jun 21 15:42:30 UTC+0800 2020 All Rights Reserved. Private Network For SIS Licensees. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/21

  11. w 1/5(W) Shutdown SIS Previous Screen Product: EXCAVATOR Model: 330D2 L EXCAVATOR PTE Configuration: 330D2 L Excavators PTE00001-UP (MACHINE) POWERED BY C7.1 Engine Disassembly and Assembly C7.1 Engines Media Number -UENR0633-19 Publication Date -01/07/2015 Date Updated -29/10/2018 i05292419 Turbocharger - Install - Turbocharger for Side Mounted Engines SMCS - 1052-012 Installation Procedure Table 1 Required Tools Tool Part Number Part Description Qty A 5P-3975 Rubber Lubricant 1 B 4C-5597 Anti-Seize Compound 1 NOTICE Keep all parts clean from contaminants. Contaminants may cause rapid wear and shortened component life. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/21

  12. w 2/5(W) Illustration 1 g03376657 1. Ensure that turbocharger (1) is clean and free from damage. Inspect the turbocharger for wear. Refer to System Operation, Testing and Adjusting, "Turbocharger Inspect" for more information. If the turbocharger is worn, the complete turbocharger must be replaced. 2. Test the wastegate actuator (19) for correct operation. Refer to System Operation, Testing and Adjusting, "Turbocharger Inspect". If the wastegate actuator is damaged or the wastegate actuator does not operate within the specified limits, the turbocharger assembly must be replaced. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/21

  13. w 3/5(W) Illustration 2 g03376117 3. Clean the gasket surface of exhaust manifold (14). 4. If necessary, install studs (15) to exhaust manifold (14). Apply Tooling (B) to the threads of studs (15). Tighten the studs to a torque of 18 N m (159 lb in). 5. Position turbocharger (1) on exhaust manifold (14). Note: Ensure that the turbocharger is correctly oriented. 6. Install nuts (16). Tighten the nuts to a torque of 44 N m (32 lb ft). 7. If a new turbocharger is installed, check that the orientation of compressor housing (18) is correct. Refer to Illustration 1. Follow Step 7.a through Step 7.c in order to orient the compressor housing. a. Loosen band clamp (20) sufficiently in order to allow the compressor housings to rotate. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/21

  14. w 4/5(W) Note: If the band clamp is damaged, replace the band clamp. b. Rotate compressor housing (18) until the compressor outlet is in the correct position. Refer to the turbocharger that was originally installed for the correct orientation. c. Ensure that band clamps (20) are correctly oriented. Refer to the turbocharger that was originally installed for the correct orientation. Tighten the band clamps finger tight. Illustration 3 g03376116 8. Ensure that tube assembly (11) and tube assembly (4) are clean, free from damage, and restriction. Replace any damaged components. 9. Position a new gasket (6) (not shown) and bolts (8) onto tube assembly (11). 10. Install tube assembly (11) onto turbocharger (1). Tighten bolts (8) finger tight. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/21

  15. w 5/5(W) 11. Position a new gasket (13) between the flange of tube assembly (11) and the cylinder block. Install bolts (12) finger tight. 12. Tighten bolts (8) and bolts (12) to a torque of 22 N m (195 lb in). 13. If a new turbocharger has been installed, check that the orientation of compressor housing (18) is correct. If the orientation of the compressor housing is not correct, rotate the compressor housing until correctly positioned. Refer to Illustration 1. Tighten band clamps (20) to a torque of 13 N m (115 lb in). 14. Remove the plug from oil inlet port (17). Refer to Illustration 1. Lubricate the turbocharger bearings with clean engine oil through the oil inlet port. Rotate the wheel of the compressor several times in order to lubricate the bearings. 15. Use Tooling (A) in order to lubricate a new O-ring seal (7). Install the O-ring seal to tube assembly (4). 16. Position a new sealing washer (3) (not shown) onto banjo bolt (2). Install the banjo bolt to tube assembly (4). 17. Install tube assembly (4) onto turbocharger (1) and the cylinder block. Tighten banjo bolt (1) finger tight. 18. Install bolt (5) finger tight. Ensure that tube assembly (4) is correctly positioned into the cylinder block. 19. Tighten banjo bolt (1) to a torque of 20 N m (177 lb in). 20. Tighten bolt (5) to a torque of 22 N m (195 lb in). 21. Connect hose (10) to the actuator. Slide clip (9) along the hose. Ensure that the hose clip is correctly positioned. 22. If the turbocharger has an exhaust elbow, install the exhaust elbow. Refer to Disassembly and Assembly, "Exhaust Elbow - Remove and Install" for the correct procedure. 23. Connect the exhaust tube assembly. Refer to the Original Equipment Manufactures (OEM) for the correct procedure. 24. Connect the hose assemblies to the turbocharger inlet and the turbocharger the outlet. Refer to the OEM for the correct procedure. Copyright 1993 - 2020 Caterpillar Inc. Sun Jun 21 15:43:26 UTC+0800 2020 All Rights Reserved. Private Network For SIS Licensees. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/21

  16. w 1/6(W) Shutdown SIS Previous Screen Product: EXCAVATOR Model: 330D2 L EXCAVATOR PTE Configuration: 330D2 L Excavators PTE00001-UP (MACHINE) POWERED BY C7.1 Engine Disassembly and Assembly C7.1 Engines Media Number -UENR0633-19 Publication Date -01/07/2015 Date Updated -29/10/2018 i05292422 Turbocharger - Install - Turbocharger for Top Mounted Engines SMCS - 1052-012 Installation Procedure Table 1 Required Tools Tool Part Number Part Description Qty A 5P-3975 Rubber Lubricant 1 B 4C-5597 Anti-Seize Compound 1 NOTICE Keep all parts clean from contaminants. Contaminants may cause rapid wear and shortened component life. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/21

  17. w 2/6(W) Illustration 1 g03374269 1. Ensure that turbocharger (19) is clean and free from damage. Inspect the turbocharger for wear. Refer to System Operation, Testing and Adjusting, "Turbocharger Inspect" for more information. If the turbocharger is worn, the complete turbocharger must be replaced. 2. Test the wastegate actuator (1) for correct operation. Refer to System Operation, Testing and Adjusting, "Turbocharger Inspect". If the wastegate actuator is damaged or the wastegate actuator does not operate within the specified limits, the turbocharger assembly must be replaced. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/21

  18. w 3/6(W) Illustration 2 g03374197 3. Place exhaust manifold (4) in a suitable support. 4. Clean the gasket surfaces of exhaust manifold (4) and spacer (22). 5. If necessary, install studs (24) to exhaust manifold (4). Apply Tooling (B) to the threads of studs (24). Tighten the studs to a torque of 18 N m (159 lb in). 6. Position spacer (22) onto the exhaust manifold. Ensure that the spacer is correctly orientated. 7. Position turbocharger (19) onto exhaust manifold (4). Note: Ensure that the turbocharger is correctly oriented. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/21

  19. w 4/6(W) 8. Apply Tooling (B) to the threads of nuts (20). Install the nuts. Tighten the nuts to a torque of 44 N m (32 lb ft). 9. If a new turbocharger is installed, bearing housing (27) and compressor housing (26) must be oriented to the correct positions. Refer to Illustration 1. Follow Step 9.a through Step 9.d in order to orient the bearing housing and the compressor housing. a. Loosen band clamps (28) sufficiently in order to allow the housings to rotate. Note: If the band clamps are damaged, replace the band clamps. b. Carefully turn bearing housing (27) until the port for oil feed (25) is upward. c. Rotate compressor housing (26) until the compressor outlet is in the correct position. Refer to the turbocharger that was originally installed for the correct orientation. d. Ensure that band clamps (28) are correctly oriented. Refer to the turbocharger that was originally installed for the correct orientation. Tighten the band clamps finger tight. 10. Ensure that tube assembly (14) and tube assembly (9) are clean, free from damage, and restriction. Replace any damaged components. 11. Position a gasket joint (21) (not shown) and bolts (23) onto tube assembly (14). 12. Install tube assembly (14) onto turbocharger (19). Tighten bolts (23) finger tight. 13. Remove the plug from oil inlet port (25). Refer to Illustration 1. Lubricate the turbocharger bearings with clean engine oil through the oil inlet port. Rotate the wheel of the compressor several times in order to lubricate the bearings. 14. Position a new sealing washer (18) (not shown) onto banjo bolt (17). Install banjo bolt (9) to tube assembly (14). 15. Position tube assembly (14) onto turbocharger (19) and install remaining new sealing washer (18) (not shown). 16. Tighten banjo bolt (9) finger tight. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/21

  20. w 5/6(W) Illustration 3 g03374196 17. Install exhaust manifold (4) and the assembly of the turbocharger to the cylinder head. Refer to Disassembly and Assembly, "Exhaust Manifold - Remove and Install" for the correct procedure. 18. If a new turbocharger has been installed, check that the orientation of bearing housing (27) is correct. If the orientation of the bearing housing is not correct, rotate the bearing housing until tube assembly (14) and tube assembly (9) are correctly positioned. Refer to Illustration 2. 19. Use Tooling (A) in order to lubricate a new O-ring seal (11) (not shown). Install the O-ring seal to tube assembly (9). Refer to Illustration 3. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/21

  21. w 6/6(W) 20. Install tube assembly (9) to the cylinder block. Ensure that the tube assembly is correctly positioned into the cylinder block. 21. Install bolt (10) hand tight. 22. Install bolt (12) and spacer (13) hand tight. 23. Tighten banjo bolt (9) to a torque of 20 N m (177 lb in). Refer to Illustration 2. 24. Tighten bolt (10) to a torque of 22 N m (195 lb in). Tighten bolt (12) to a torque of 44 N m (32 lb ft). 25. Position a new gasket (16) (not shown) between the flange of tube assembly (14) and the cylinder block. Install bolts (15) finger tight. 26. Install bolt (7) and spacer (8) (not shown) hand tight. 27. Tighten bolts (23) to a torque of 22 N m (195 lb in). Refer to Illustration 2. 28. Tighten bolt (15) to a torque of 22 N m (195 lb in). Tighten bolt (7) to a torque of 44 N m (32 lb ft). 29. If a new turbocharger has been installed, tighten band clamps (28) to a torque of 13 N m (115 lb in). Refer to Illustration 1. 30. Connect hose (3) to actuator (1). Slide clip (2) along the hose. Ensure that the hose clip is correctly positioned. 31. Install bolts (6) to the clip for tube assembly (5). Tighten the bolt to a torque of 22 N m (195 lb in). 32. If the turbocharger has an exhaust elbow, install the exhaust elbow. Refer to Disassembly and Assembly, "Exhaust Elbow - Remove and Install" for the correct procedure. 33. Connect the exhaust tube assembly. Refer to the Original Equipment Manufactures (OEM) for the correct procedure. 34. Connect the hose assemblies to the turbocharger inlet and the turbocharger the outlet. Refer to the OEM for the correct procedure. Copyright 1993 - 2020 Caterpillar Inc. Sun Jun 21 15:44:22 UTC+0800 2020 All Rights Reserved. Private Network For SIS Licensees. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/21

  22. w 1/5(W) Shutdown SIS Previous Screen Product: EXCAVATOR Model: 330D2 L EXCAVATOR PTE Configuration: 330D2 L Excavators PTE00001-UP (MACHINE) POWERED BY C7.1 Engine Disassembly and Assembly C7.1 Engines Media Number -UENR0633-19 Publication Date -01/07/2015 Date Updated -29/10/2018 i05292434 Wastegate Solenoid - Remove and Install SMCS - 1057-010 Removal Procedure Illustration 1 g03381127 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/21

  23. w 2/5(W) Illustration 2 g03381128 1. Disconnect harness assembly (1) from harness assembly (2). Slide connection for harness assembly (2) from bracket (3). 2. Remove allen bolts (4) and remove bracket (3). 3. Make temporary mark on wastegate solenoid (5) for installation purposes. Remove wastegate solenoid (2) from inlet manifold connection (6). Installation Procedure Table 1 Required Tools Tool Part Number Part Description Qty A 5P-3975 Rubber Lubricant 1 1. Ensure that all components of wastegate solenoid are clean and free from wear and damage. If necessary, replace the wastegate solenoid as an assembly if any of components are worn or damaged. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/21

  24. w 3/5(W) Illustration 3 g03381129 2. Ensure that O-ring seals (7) on wastegate solenoid (6) are free from damage and wear. 3. If the O-ring seals are damaged or worn, the wastegate solenoid should be replaced as an assembly. 4. Ensure that the ports in Position (X) are clean and free from restriction. 5. Use Tooling (A) in order to lubricate O-ring seal (7) on wastegate solenoid (6). https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/21

  25. w 4/5(W) Illustration 4 g03381128 https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/21

  26. Suggest: If the above button click is invalid. Please download this document first, and then click the above link to download the complete manual. Thank you so much for reading

  27. w 5/5(W) Illustration 5 g03381127 6. Install wastegate solenoid (5) to inlet manifold connection (6). Note: Ensure that the wastegate solenoid is correctly orientated. 7. Position bracket (3) onto wastegate solenoid (5). Ensure that the bracket is correctly orientated. 8. Install allen bolts (4) to wastegate solenoid (5). Tighten the bolts to a torque of 5 N m (44 lb in). 9. Slide the connection for harness assembly (2) onto bracket (3). Connect harness assembly (1) to harness assembly (2). Copyright 1993 - 2020 Caterpillar Inc. Sun Jun 21 15:45:17 UTC+0800 2020 All Rights Reserved. Private Network For SIS Licensees. https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw... 2020/6/21

  28. https://www.ebooklibonline.com Hello dear friend! Thank you very much for reading. Enter the link into your browser. The full manual is available for immediate download. https://www.ebooklibonline.com

Related


More Related Content