BSNL 4G Project Overview and Myths Debunked

 
BSNL 4G:
Plan and Facts
 
Ayan Paul
District Secretary, AIGETOA CMTS
AGM (NWP-CM) (L/A), CTD
 
 
 
 
AGM and 4th Circle Conference, AIGETOA CTD, Kolkata
 
AGENDA
 
01
 
Introduction of the project
 
Introduction
 
02
 
Some common conception
 
Myths
 
03
 
Technical details
 
Project Overview
 
04
 
Deliverables & Expectations
 
Conclusion
 
AGM and 4th Circle Conference, AIGETOA CTD, Kolkata
 
Technology provider:
Radio access networks
Introduction
 
Network operator
 
System integrator
BSNL 4G Project: A project by Government of India  to achieve larger objective of
self-reliance in communication networks
 
Technology Provide:
Core Networks
AGM and 4th Circle Conference, AIGETOA CTD, Kolkata
 
 
 
02
 
Myths
 
Some common conception
 
AGM and 4th Circle Conference, AIGETOA CTD at Kolkata
Myth#1
As private players are launching 5G, 4G is going to be obsolete soon
AGM and 4th Circle Conference, AIGETOA CTD, Kolkata
 
4G is expected to
retain 55% of
market share in
2027 compared to
39% for 5G.
Source: Ericsson Mobility
Report, June 2022
Myth#2
BSNL is deploying old technology network deployed by other
operators years ago
AGM and 4th Circle Conference, AIGETOA CTD at Kolkata
 
3GPP Release 8
 
3GPP Release 10
 
3GPP Release 12
Myth#3
BSNL is deploying unproven network gear from inexperienced vendor
AGM and 4th Circle Conference, AIGETOA CTD at Kolkata
 
03
 
Project
Overview
 
Technical details
 
AGM and 4th Circle Conference, AIGETOA CTD at Kolkata
 
Separate spectrum will be allocated for 4G at
2100 MHz band
Spectrum used for 3G will be utilized for 4G
Partial spectrum at 900 MHz band will be
used for 4G
Rest will be used for 2G services
 
 
Project Overview: Spectrum
AGM and 4th Circle Conference, AIGETOA CTD at Kolkata
 
5G network architecture that supports 4G
CUPS: Control and User Plane Separation
100% virtualized core
Using off-the-shelf hardware or server
Cloud-native solution
Non-Stand Alone (NSA) architecture
To support 4G and 5G RANs
eNode-B (4G BTS) having transport
capabilities
 
Project Overview: Equipment
AGM and 4th Circle Conference, AIGETOA CTD at Kolkata
Specifications of 4G BTS
AGM and 4th Circle Conference, AIGETOA CTD at Kolkata
 
04
 
Conclusion
 
Deliverables & Expectations
 
AGM and 4th Circle Conference, AIGETOA CTD at Kolkata
 
Mobile site planning to be done by BSNL
Backhaul to be readied by BSNL (Planning &
execution)
Active participation in execution of the
project
May not be 
turn-key
 as before
Teething trouble during deployment
CI/CD approach
Continuous Improvement- Continuous
development
 
 
 
 
 
Conclusion
AGM and 4th Circle Conference, AIGETOA CTD at Kolkata
 
    Thank you !
 
AGM and 4th Circle Conference, AIGETOA CTD at Kolkata
 
apaul@bsnl.co.in
 
+91  94330 00570
 
Slide Note
Embed
Share

BSNL's 4G project aims to enhance communication networks in India. This initiative addresses common misconceptions surrounding the deployment of 4G technology by BSNL, including market share trends and network technology advancements. The project overview emphasizes spectrum allocation and utilization for 4G services. Through detailed technical insights and dispelling myths, BSNL is positioning itself as a key player in the evolution of mobile networks.

  • BSNL
  • 4G project
  • Myths debunked
  • Communication networks
  • Spectrum allocation

Uploaded on Aug 10, 2024 | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. BSNL 4G: Plan and Facts Ayan Paul District Secretary, AIGETOA CMTS AGM (NWP-CM) (L/A), CTD AGM and 4th Circle Conference, AIGETOA CTD, Kolkata

  2. AGENDA 01 Introduction 03 Project Overview Introduction of the project Technical details 02 Myths 04 Conclusion Some common conception Deliverables & Expectations AGM and 4th Circle Conference, AIGETOA CTD, Kolkata

  3. Introduction BSNL 4G Project: A project by Government of India to achieve larger objective of self-reliance in communication networks Network operator System integrator Technology provider: Radio access networks Technology Provide: Core Networks AGM and 4th Circle Conference, AIGETOA CTD, Kolkata

  4. 02 Myths Some common conception AGM and 4th Circle Conference, AIGETOA CTD at Kolkata

  5. Myth#1 As private players are launching 5G, 4G is going to be obsolete soon 4G is expected to retain 55% of market share in 2027 compared to 39% for 5G. Source: Ericsson Mobility Report, June 2022 AGM and 4th Circle Conference, AIGETOA CTD, Kolkata

  6. Myth#2 BSNL is deploying old technology network deployed by other operators years ago 3GPP Release 8 3GPP Release 10 3GPP Release 12 AGM and 4th Circle Conference, AIGETOA CTD at Kolkata

  7. Myth#3 BSNL is deploying unproven network gear from inexperienced vendor AGM and 4th Circle Conference, AIGETOA CTD at Kolkata

  8. 03 Project Overview Technical details AGM and 4th Circle Conference, AIGETOA CTD at Kolkata

  9. Project Overview: Spectrum Separate spectrum will be allocated for 4G at 2100 MHz band Spectrum used for 3G will be utilized for 4G Partial spectrum at 900 MHz band will be used for 4G Rest will be used for 2G services AGM and 4th Circle Conference, AIGETOA CTD at Kolkata

  10. Project Overview: Equipment 5G network architecture that supports 4G CUPS: Control and User Plane Separation 100% virtualized core Using off-the-shelf hardware or server Cloud-native solution Non-Stand Alone (NSA) architecture To support 4G and 5G RANs eNode-B (4G BTS) having transport capabilities AGM and 4th Circle Conference, AIGETOA CTD at Kolkata

  11. Specifications of 4G BTS BSNL 4G RAN Equipment Dimension/Weight/Power OD cabinet of BBU Dimension (H) 1100 mm x (W) 700 mm x (D)480mm OD cabinet BBU Weight ( including BBU) 128 Kg Weight per RRH 15 Kg (2 nos. RRH Per Site) Dimension per RRH 435mm x 345 mm x 104 mm Total Power Consumption (BBU+ 2 nos. RRH) 1950 Watt Antennas Existing Antennas or will be swap by new antennas of similar/smaller size. Sr. No. Power Infra Config. QAM Bandwidth Downlink Speed Uplink Speed Battery 200/400 AH Li-Ion Type 1 2 T x 2R 64 10 MHz 75Mbps 25Mbps 2 4 T x 4 R 64 10 MHz 150Mbps 25Mbps SMPS 150/300 A (Compatible with Li-ion) AGM and 4th Circle Conference, AIGETOA CTD at Kolkata

  12. 04 Conclusion Deliverables & Expectations AGM and 4th Circle Conference, AIGETOA CTD at Kolkata

  13. Conclusion Mobile site planning to be done by BSNL Backhaul to be readied by BSNL (Planning & execution) Active participation in execution of the project May not be turn-key as before Teething trouble during deployment CI/CD approach Continuous Improvement- Continuous development AGM and 4th Circle Conference, AIGETOA CTD at Kolkata

  14. Thank you ! apaul@bsnl.co.in +91 94330 00570 AGM and 4th Circle Conference, AIGETOA CTD at Kolkata

More Related Content

giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#giItT1WQy@!-/#