Analysis of 2021 Marginal Generation Costs for San Diego Gas & Electric
The analysis presents the 2021 Marginal Generation Costs methodology filed by San Diego Gas & Electric in April 2016 for the Time-of-Use (TOU) OIR Workshop. It includes forecasts for Marginal Energy Costs (MEC) and Marginal Generation Capacity Costs (MGCC) for the calendar year 2021, based on market prices and local capacity needs. The data provides hourly electricity prices and MGCC costs for the top 100 hours of forecasted demand.
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
E N D
Presentation Transcript
Presentation of 2021 Marginal Generation Costs Filed April 29, 2016 San Diego Gas & Electric May 5th, 2016 TOU OIR Workshop
2021 Marginal Generation Cost Methodology Commodity Marginal Costs: Consistent methodology as used in SDG&E s 2016 GRC Phase 2, but for calendar year 2021 instead of 2016. Marginal Energy Costs ( MEC ): Forecasted hourly price profile based on net load in the SP-15 market. Projected monthly on-peak and off-peak 2021 SP-15 electric market forward market prices. The result is a profile of hourly electricity prices for calendar year 2021. Marginal Generation Capacity Cost ( MGCC ): Based on SDG&E s 2016 GRC Phase 2 value of roughly $118/kW-year. Marginal Generation Capacity Cost Allocation: 2021 Loss of Load Expectation ( LOLE ) analysis, consistent with the modeling in the 2016 GRC Phase 2. The analysis is of SDG&E s local capacity needs, not statewide capacity needs, and varies from the 2016 LOLE analysis in that: Loads reflect 2021 expected conditions net of behind-the-meter solar and Retirement of the Encina power plant, addition of the Pio Pico plant, addition of the Carlsbad power plant, and incremental renewable contracts in the San Diego Greater Reliability area scheduled to begin operating after 2016. The result is a profile of hourly MGCC costs for calendar year 2021 assigned to the top 100 hours of forecasted need.
2021 Marginal Energy Cost $/kWh (MEC) Non-Holiday Weekday: Hour Ending (Clock Time/Pacific Prevailing Time) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 0.037 0.035 0.034 0.034 0.035 0.038 0.038 0.040 0.041 0.040 0.038 0.035 0.035 0.035 0.040 0.042 0.045 0.052 0.056 0.053 0.048 0.043 0.044 0.039 0.037 0.035 0.035 0.035 0.036 0.039 0.040 0.043 0.042 0.039 0.034 0.029 0.027 0.030 0.035 0.041 0.045 0.055 0.058 0.055 0.050 0.045 0.044 0.040 0.038 0.035 0.033 0.033 0.033 0.035 0.039 0.042 0.041 0.035 0.027 0.021 0.020 0.022 0.030 0.041 0.049 0.053 0.055 0.055 0.056 0.053 0.047 0.042 0.034 0.032 0.030 0.030 0.029 0.030 0.042 0.044 0.043 0.036 0.025 0.020 0.019 0.019 0.024 0.032 0.043 0.053 0.058 0.059 0.060 0.061 0.043 0.038 0.035 0.032 0.030 0.029 0.028 0.028 0.040 0.042 0.039 0.028 0.027 0.019 0.020 0.019 0.027 0.035 0.045 0.053 0.057 0.058 0.060 0.062 0.044 0.039 0.034 0.030 0.029 0.028 0.027 0.027 0.041 0.040 0.033 0.026 0.018 0.017 0.019 0.024 0.026 0.033 0.048 0.064 0.068 0.067 0.063 0.063 0.041 0.038 0.039 0.035 0.033 0.031 0.031 0.031 0.041 0.042 0.040 0.034 0.026 0.024 0.028 0.031 0.035 0.045 0.061 0.068 0.071 0.068 0.065 0.065 0.049 0.044 0.040 0.036 0.034 0.032 0.032 0.032 0.039 0.041 0.041 0.038 0.032 0.028 0.026 0.034 0.041 0.051 0.061 0.068 0.070 0.067 0.063 0.063 0.051 0.045 0.040 0.036 0.034 0.032 0.032 0.032 0.039 0.044 0.043 0.038 0.034 0.031 0.032 0.030 0.036 0.051 0.059 0.065 0.068 0.066 0.065 0.062 0.051 0.045 0.041 0.037 0.036 0.034 0.034 0.034 0.035 0.040 0.040 0.038 0.033 0.027 0.025 0.029 0.039 0.047 0.054 0.057 0.059 0.057 0.056 0.053 0.051 0.045 0.039 0.037 0.036 0.035 0.035 0.037 0.040 0.040 0.035 0.030 0.026 0.025 0.026 0.031 0.039 0.048 0.056 0.059 0.058 0.056 0.054 0.050 0.048 0.043 0.037 0.036 0.035 0.035 0.036 0.039 0.037 0.040 0.041 0.040 0.038 0.037 0.036 0.038 0.041 0.043 0.044 0.051 0.053 0.050 0.046 0.041 0.045 0.040 Month Weekend or Holiday: Hour Ending (Clock Time/Pacific Prevailing Time) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 0.033 0.031 0.030 0.030 0.030 0.032 0.031 0.032 0.033 0.032 0.030 0.028 0.024 0.027 0.031 0.034 0.038 0.043 0.045 0.044 0.042 0.040 0.039 0.036 0.036 0.034 0.033 0.033 0.033 0.034 0.034 0.035 0.034 0.032 0.027 0.021 0.021 0.021 0.027 0.033 0.038 0.044 0.046 0.045 0.044 0.042 0.041 0.038 0.037 0.035 0.033 0.031 0.031 0.031 0.032 0.033 0.033 0.031 0.028 0.025 0.018 0.015 0.021 0.030 0.037 0.042 0.045 0.046 0.047 0.047 0.044 0.041 0.032 0.031 0.029 0.028 0.027 0.027 0.031 0.031 0.029 0.024 0.022 0.014 0.009 0.013 0.012 0.021 0.024 0.036 0.042 0.044 0.045 0.045 0.038 0.036 0.033 0.031 0.028 0.027 0.026 0.026 0.031 0.031 0.027 0.021 0.020 0.004 0.007 0.006 0.015 0.023 0.032 0.039 0.042 0.044 0.046 0.048 0.040 0.036 0.032 0.031 0.029 0.027 0.026 0.026 0.032 0.030 0.025 0.011 0.002 0.004 0.006 0.008 0.010 0.011 0.029 0.039 0.048 0.049 0.048 0.048 0.039 0.036 0.037 0.035 0.032 0.030 0.029 0.028 0.033 0.032 0.030 0.025 0.020 0.013 0.014 0.020 0.027 0.030 0.041 0.051 0.054 0.055 0.053 0.053 0.044 0.041 0.038 0.037 0.034 0.031 0.031 0.030 0.033 0.032 0.029 0.022 0.015 0.013 0.013 0.015 0.019 0.029 0.038 0.049 0.054 0.054 0.052 0.052 0.047 0.043 0.038 0.036 0.033 0.031 0.030 0.030 0.033 0.035 0.033 0.030 0.025 0.019 0.017 0.020 0.023 0.035 0.043 0.050 0.055 0.055 0.055 0.053 0.046 0.042 0.037 0.036 0.033 0.032 0.031 0.030 0.030 0.031 0.031 0.028 0.019 0.013 0.009 0.013 0.016 0.031 0.039 0.045 0.049 0.050 0.049 0.048 0.046 0.043 0.038 0.035 0.033 0.032 0.031 0.032 0.032 0.030 0.026 0.021 0.019 0.019 0.020 0.024 0.031 0.039 0.047 0.051 0.051 0.050 0.049 0.046 0.043 0.040 0.038 0.036 0.034 0.034 0.034 0.035 0.032 0.034 0.036 0.036 0.035 0.034 0.033 0.034 0.036 0.037 0.040 0.046 0.048 0.046 0.045 0.042 0.043 0.039 Month
2021 Marginal Generation Capacity Cost $/kWh (MGCC) Non-Holiday Weekday: Hour Ending (Clock Time/Pacific Prevailing Time) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.032 0.043 0.200 0.039 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.043 0.094 0.153 0.200 0.424 0.594 0.210 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.040 0.095 0.174 0.255 0.292 0.395 0.810 0.593 0.234 0.035 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.035 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.097 0.060 0.000 0.000 0.000 0.000 Month Weekend or Holiday: Hour Ending (Clock Time/Pacific Prevailing Time) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.080 0.102 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.085 0.325 0.230 0.077 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Month
2021 Total Marginal Generation Cost $/kWh (MGC) Non-Holiday Weekday: Hour Ending (Clock Time/Pacific Prevailing Time) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 0.037 0.035 0.034 0.034 0.035 0.038 0.038 0.040 0.041 0.040 0.038 0.035 0.035 0.035 0.040 0.042 0.045 0.052 0.056 0.053 0.048 0.043 0.044 0.039 0.037 0.035 0.035 0.035 0.036 0.039 0.040 0.043 0.042 0.039 0.034 0.029 0.027 0.030 0.035 0.041 0.045 0.055 0.058 0.055 0.050 0.045 0.044 0.040 0.038 0.035 0.033 0.033 0.033 0.035 0.039 0.042 0.041 0.035 0.027 0.021 0.020 0.022 0.030 0.041 0.049 0.053 0.055 0.055 0.056 0.053 0.047 0.042 0.034 0.032 0.030 0.030 0.029 0.030 0.042 0.044 0.043 0.036 0.025 0.020 0.019 0.019 0.024 0.032 0.043 0.053 0.058 0.059 0.060 0.061 0.043 0.038 0.035 0.032 0.030 0.029 0.028 0.028 0.040 0.042 0.039 0.028 0.027 0.019 0.020 0.019 0.027 0.035 0.045 0.053 0.057 0.058 0.060 0.062 0.044 0.039 0.034 0.030 0.029 0.028 0.027 0.027 0.041 0.040 0.033 0.026 0.018 0.017 0.019 0.024 0.026 0.033 0.048 0.064 0.068 0.067 0.063 0.063 0.041 0.038 0.039 0.035 0.033 0.031 0.031 0.031 0.041 0.042 0.040 0.034 0.026 0.024 0.028 0.031 0.035 0.045 0.061 0.068 0.103 0.111 0.265 0.104 0.049 0.044 0.040 0.036 0.034 0.032 0.032 0.032 0.039 0.041 0.041 0.038 0.032 0.028 0.026 0.034 0.041 0.094 0.154 0.221 0.270 0.491 0.657 0.273 0.051 0.045 0.040 0.036 0.034 0.032 0.032 0.032 0.039 0.044 0.043 0.038 0.034 0.031 0.032 0.071 0.130 0.225 0.313 0.356 0.463 0.876 0.658 0.297 0.086 0.045 0.041 0.037 0.036 0.034 0.034 0.034 0.035 0.040 0.040 0.038 0.033 0.027 0.025 0.029 0.039 0.047 0.054 0.057 0.059 0.092 0.056 0.053 0.051 0.045 0.039 0.037 0.036 0.035 0.035 0.037 0.040 0.040 0.035 0.030 0.026 0.025 0.026 0.031 0.039 0.048 0.056 0.059 0.058 0.056 0.054 0.050 0.048 0.043 0.037 0.036 0.035 0.035 0.036 0.039 0.037 0.040 0.041 0.040 0.038 0.037 0.036 0.038 0.041 0.043 0.044 0.051 0.150 0.110 0.046 0.041 0.045 0.040 Month Weekend or Holiday: Hour Ending (Clock Time/Pacific Prevailing Time) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 0.033 0.031 0.030 0.030 0.030 0.032 0.031 0.032 0.033 0.032 0.030 0.028 0.024 0.027 0.031 0.034 0.038 0.043 0.045 0.044 0.042 0.040 0.039 0.036 0.036 0.034 0.033 0.033 0.033 0.034 0.034 0.035 0.034 0.032 0.027 0.021 0.021 0.021 0.027 0.033 0.038 0.044 0.046 0.045 0.044 0.042 0.041 0.038 0.037 0.035 0.033 0.031 0.031 0.031 0.032 0.033 0.033 0.031 0.028 0.025 0.018 0.015 0.021 0.030 0.037 0.042 0.045 0.046 0.047 0.047 0.044 0.041 0.032 0.031 0.029 0.028 0.027 0.027 0.031 0.031 0.029 0.024 0.022 0.014 0.009 0.013 0.012 0.021 0.024 0.036 0.042 0.044 0.045 0.045 0.038 0.036 0.033 0.031 0.028 0.027 0.026 0.026 0.031 0.031 0.027 0.021 0.020 0.004 0.007 0.006 0.015 0.023 0.032 0.039 0.042 0.044 0.046 0.048 0.040 0.036 0.032 0.031 0.029 0.027 0.026 0.026 0.032 0.030 0.025 0.011 0.002 0.004 0.006 0.008 0.010 0.011 0.029 0.039 0.048 0.049 0.048 0.048 0.039 0.036 0.037 0.035 0.032 0.030 0.029 0.028 0.033 0.032 0.030 0.025 0.020 0.013 0.014 0.020 0.027 0.030 0.041 0.051 0.054 0.055 0.053 0.053 0.044 0.041 0.038 0.037 0.034 0.031 0.031 0.030 0.033 0.032 0.029 0.022 0.015 0.013 0.013 0.015 0.019 0.029 0.038 0.049 0.054 0.133 0.155 0.052 0.047 0.043 0.038 0.036 0.033 0.031 0.030 0.030 0.033 0.035 0.033 0.030 0.025 0.019 0.017 0.020 0.023 0.035 0.043 0.050 0.139 0.380 0.285 0.130 0.046 0.042 0.037 0.036 0.033 0.032 0.031 0.030 0.030 0.031 0.031 0.028 0.019 0.013 0.009 0.013 0.016 0.031 0.039 0.045 0.049 0.050 0.049 0.048 0.046 0.043 0.038 0.035 0.033 0.032 0.031 0.032 0.032 0.030 0.026 0.021 0.019 0.019 0.020 0.024 0.031 0.039 0.047 0.051 0.051 0.050 0.049 0.046 0.043 0.040 0.038 0.036 0.034 0.034 0.034 0.035 0.032 0.034 0.036 0.036 0.035 0.034 0.033 0.034 0.036 0.037 0.040 0.046 0.048 0.046 0.045 0.042 0.043 0.039 Month
Key Differences between SCE/PG&E and SDG&E SCE: SCE has higher average MEC SCE has higher MGC in 5-6 pm throughout the year with the inclusion of flexible capacity SCE has higher MGC Jul-Sep in 5-7 pm and lower in 7-9 pm due to different LOLE hours PG&E: PG&E has lower MGCC PG&E has lower MEC in March-May in afternoon hours, especially on weekends July and September are switched for MGCC highest in July for PG&E, highest in September for SDG&E PGE has higher prices 12am-8am