Re4/1 - PowerPoint PPT Presentation


New Bakelite Production Phase 2: Salvatore Buontempo Presentation at CMS Central TC Group Meeting

Salvatore Buontempo presented on behalf of CMS Central TC Group at a meeting discussing Bakelite production facilities in Puricelli for CMS RE4 production. The presentation covered new production constraints, quality control measures, and details of the production facilities including a large craft

0 views • 11 slides


Analysis of Parameter Space for RE3/1 and RE4/1 Modules

Explore the intricate designs and dimensions of RE3/1 and RE4/1 modules, including mounting posts, cross-section details, envelopes, and verification processes. The study emphasizes the need for detailed analysis and production of accurate envelopes for these modules. Key considerations include spac

0 views • 9 slides