FCR Dimensioning Rules Proposal for Synchronous Area Operational Agreements
Article 118 of the Synchronous Operational Agreements introduces rules for the dimensioning of Frequency Containment Reserve (FCR). The proposal requires TSOs to jointly develop guidelines for FCR dimensioning, including annual reserve capacity determination and initial obligations. Specific criteri
0 views • 16 slides
Understanding Full Committee Review (FCR) vs. Designated Member Review (DMR) for New IACUC Members
Explore the differences between Full Committee Review (FCR) and Designated Member Review (DMR) for new IACUC members. Learn the acceptable methods of protocol review, federal requirements, member responsibilities, risks, and best practices for protocol approval. Dive into the two valid methods of IA
1 views • 23 slides
Cost-Benefit Analysis Methodology as per EU Regulation 2017/1485
This proposal outlines a comprehensive Cost-Benefit Analysis (CBA) methodology in line with Article 156(11) of the Commission Regulation (EU) 2017/1485. The methodology is designed to address the requirements for Frequency Containment Reserve (FCR) and Limited Energy Reservoirs (LER) within the regu
0 views • 64 slides
Exploration of Site Features through Images
This collection showcases various features found at a specific site, including landscapes, floodplains, terraces, red flags, charcoal layers, and fire-cracked rocks (FCR). The images provide insights into the environment and geological elements present at the site, inviting viewers to explore and an
0 views • 37 slides
Comprehensive Overview of Protocol Review Methods
Delve into the realm of Designated Member Review (DMR), Full Committee Review (FCR), and Continuing Review with experts Joe Crossno, Larissa Dobbelaere, Nicole Duffee, Cyd Gillett, and Tracy Thompson. Explore the goals, objectives, and options for assessments in understanding when to use DMR and FCR
0 views • 17 slides