Proposed New Baseline Cryogenics Layout Consensus at CERN Workshop
The consensus at the CERN workshop led to a proposal for a new baseline cryogenics layout with major components on the surface. The cost balance is deemed neutral and requires further investigation before submission. Various comparisons highlight the advantages and potential cost savings of the prop
2 views • 7 slides
Weekly Report on Magnets Vertical Test at BNL - Nov 30, 2020
Building 902 High Bay Magnet Division has started work on various phases including coil fabrication, preparation, and testing. Cryogenics updates mention progress on replacing the heat exchanger with plans for cooldown after New Year. The quench antenna is being shipped for amplifier replacement, an
0 views • 12 slides
Review of Long-Baseline Neutrino Facility Cryogenics Performance and Recommendations
The review of cryogenics performance at the Long-Baseline Neutrino Facility highlighted the priority given to cryogenics testing on ProtoDUNE. The comprehensive commissioning plan includes testing of the cryostat, cryogenics, and detectors, with a focus on data collection and simulation validation.
0 views • 18 slides
Understanding Cryogenics: Torus 4K Operation and Recovery
This lesson delves into the intricate details of Torus 4K operation and recovery in cryogenics. Topics covered include supply from ESR main compressors, cold box, valve box, helium distribution, supercritical helium flow, back pressure control, and more. Special notes emphasize the importance of ver
0 views • 31 slides
Detector Assembly and Cryogenics Requirements for ILD Project
The ILD project involves assembling detectors using pre-assembled pieces on surface and lowering them into the assembly area. The detectors are equipped with various components like muon detectors, solenoids, and calorimeters. Magnetic field measurements are carried out during the assembly process.
0 views • 11 slides