New Gorbals Health and Care Centre Overview
New Gorbals Health and Care Centre, managed by Glasgow City HSCP, offers a wide range of health services including GP practices, dental care, physiotherapy, mental health services, and more. The facility was handed over in November 2018 with a planned opening date in January 2019. Address: 2 Sandiefield Road, Glasgow G5 9AB. Current services from Gorbals Health Centre, Two Max Building, and South Bank Centre will be consolidated at this new state-of-the-art facility. The building features various floors including ground and first with services like specialist children's services and CAMHS. The design includes modern interiors, controlled access points, and ample parking options. A travel plan has been developed to facilitate easy access for visitors and staff.
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
E N D
Presentation Transcript
Glasgow City HSCP New Gorbals Health and Care Centre Hamish Battye, Head of Planning and Strategy, Older People and South Locality Lisa Martin Community Engagement Officer December 2018
Current Position Building was handed over on Tuesday 6th November 2018 Planned opening date is Monday 21st January 2019 Handover period to deal with any snagging issues Address: New Gorbals Health and Care Centre 2 Sandiefield Road Glasgow G5 9AB Telephone number for main Reception: 0141 201 5000
Services All services in the current Gorbals Health Centre including: GP practices, dental practices, treatment room services, physiotherapy, podiatry, district nursing, health visiting, speech and language therapy and other clinics such as dietetics, community mental health services and others All services in the current Two Max Building including: Children and Families tea, Homelessness Team, Alcohol and Drug Recovery Service and Criminal Justice Team All services in the current South Bank Centre including: Specialist Children s Services, CAMHS and Community Paediatrics
External Elevation Left: Front Entrance Above: Sign
Above: Corner elevation above Alcohol and Drug Recovery Service Above: Controlled access at Sandiefield Road
Internal Images Above: 2nd Floor corridor Left: Main stairwell
Far left: Internal signage Left: Standard Clinical Room
Left: Main Atrium Above: Courtyard View
Transport, Parking and Access Travel Plan sets out how we will support visitors and staff to consider active and alternative travel to the Centre On site secure bike parking for visitors and staff Electric bikes for staff Electric car charging space Local public transport options highlighted to all staff Parking Plan in place to manage the 75 available spaces Disabled spaces at the front of the building Discussions with Co-op re: access to spaces in car park on-going
Publicity and Communications Open evening and site visits being planned in lead up to the opening on 21st January 2019 Newsletter being published in December 2018 with all the information patients, users and the wider public will need to access the new building Articles in HSCP newsletter, NGHA newsletter and local websites Social media follow us on Twitter @gorbalscentre Ministerial opening to take place sometime in early Spring (date pending)
Discussion Your comments/feedback/questions. Thank you.