Proposed South-North Link Road Project in Ferrybank, Kilkenny

Slide Note
Embed
Share

The Ferrybank-Belview Local Area Plan aims to enhance the road network for sustainable development in the area. The proposed South-North Link Road project will create a crucial connection between Belmont Road Roundabout and Abbeygate Roundabout, promoting active travel and public transport. With a focus on future housing development, the project includes a new road overbridge, pedestrian and cyclist facilities, and provisions for bus stops. Funded by URDF, this initiative emphasizes mobility and infrastructure development in the region.


Uploaded on Jul 23, 2024 | 1 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. Download presentation by click this link. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

E N D

Presentation Transcript


  1. KILKENNY KILKENNY Part 8 Proposal South-North Link Road, Ferrybank, Co Kilkenny Council Meeting 21st February, 2022 where medieval meets modern

  2. The Ferrybank-Belview Local Area Plan identified the need for improvement of the existing road network in order to allow for the proper planning and sustainable development of the Plan Area. Scheme Purpose The scheme will: Create a continuous road and active travel link between the existing Belmont Road Roundabout to the existing Abbeygate Roundabout Facilitate mobility in the Ferrybank area and in particular active travel and public transport Provide necessary Infrastructure for the future development of zoned housing lands Funding by way of URDF funding and own resources

  3. The link is approximately 1km in length, Principal Features Provision of a new road overbridge over the existing Greenway. Provide a new footpath link to the Greenway by way of a new shared surface on the top of the existing Greenway embankment with access via a ramped shared surface to the Greenway Provision of cyclist and pedestrian facilities Provision for future bus-stops each side of the new road.